|
The Subject Of The Order Is The Construction Of A Service Building - The Headquarters Of The Volunteer Fire Department Along With The Demolition Of The Existing Building Of The Volunteer Fire Department In Kopalino (Plot No. 69/3, 69/5, Kopalino District), Which Includes: 1) Construction Of A Building With Dimensions In The Horizontal Projection Of 16.80 M X 10.88 M, Two-Story (Ground Floor And Attic), No Basement, Covered Gable Roof With A Slope Angle Of 40°. The Façade Is Finished With Light Brown Clinker Tiles, The Roof Is Covered With Graphite-Colored Galvanized Sheet Metal. 2) Characteristic Technical Parameters: - Height Of The Designed Building 8.6 M, - Usable Area 184.70 M2, - Building Area 149.65 M2, - Total Area 299.30 M2, - Volume 980.90 M3.3) The Development Of The Area Includes: - Access Roads, - Driveways, - Parking Spaces, - Solid Waste Collection Area (Shelter), - Septic Tank For Liquid Waste, - Fence, - Greenery. The Order Does Not Include Cutting Down 3 Trees. The Scope Of The Order Also Includes: - Lowering And Strengthening A Section Of The Sidewalk (In Accordance With The Layers Specified Below) At Ul. Bursztynowa Indicated On The Pzt Along The Length Of The Entrance. - Access Road, Entries/Exits From The Layers: Chamfered Concrete Cubes, Thickness. 8 Cm, Cement-Sand Backfill 3 Cm (After Compaction), Base Base Made Of Crushed Aggregate 0/31.5 C90/3 With A Thickness Of 25 Cm (After Compaction), Stabilization Layer With Cement Rm = 2.5 Mpa, Thickness. 15 Cm (In The Case Of A Base Other Than G1), Compacted Native Soil - Required Secondary Deformation Modulus E2 80 Mpa. Limit The Surfaces With A Resistor Of 12 X 25 X 100 Cm On A Concrete Bench With Resistance Class C12/15. - Relocation And Protection Of The Siren System, Psp And Other Existing Alarm Systems For The Duration Of Construction. - Protection Of The Existing Power Box. - Installation Of An Internal Camera In The Garage. - Construction Of A Water Supply Connection. The Contractor Will Ensure, On His Own And At His Own Expense, That The Construction Site Is Supplied With Electricity And Supplies During The Construction Period. Water. The Contractor Is Obliged To Perform The Subject Of The Contract In Accordance With The Construction Design And The Arrangements Of The Network Owners. Moreover, The Contractor Will Provide The Ordering Party, Within The Deadline For Completing The Subject Of The Order, With All Necessary Opinions, Decisions, And Acceptances (Including Sanepid, Fire Brigade) In Order For The Ordering Party To Obtain A Decision On The Permit To Use The Building In Question.
|