|
The Subject Of The Order Is The Performance Of Thermal Modernization Works Of The Building: Thermal Modernization Of The Building Of Primary School No. 2 In Wola At Ul. Lipowa 3 As Part Of The Task Entitled: Improvement Of The Energy Efficiency Of The School Building In The Miedźna Commune, Including: 1.1. Segment Aa) Insulation Of Walls From The Inside And Finishing Of Walls, B) Reconstruction Of Approaches To Radiators And Relocation Of Radiators, C) Filling In Gaps On Walls And Ceilings, D) Priming And Double Painting Of Rooms And Corridors, E) Insulation Of The Roof Above The Ground Floor, F) Demolition Of Plasterboard Buildings With Grate, G) Construction Of Plasterboard Buildings, H) Execution Of Thermal Insulation Of The Façade, I) New Flashing Of The Attic On The Insulated Wall, J) Replacement Of Windows And Doors, As Well As Roof Windows, K) Replacement Of Window Sills, L) Finishing The Façade With Thin-Layer Silicone Plaster, 1.2. Segment Da) Insulation Of Walls From The Inside And Finishing Of Walls, B) Reconstruction Of Approaches To Radiators And Relocation Of Radiators, C) Filling In Gaps On Walls And Ceilings, D) Priming And Double-Painting Rooms And Corridors, E) Demolition Of Attic Structures Made Of Plasterboards With Grate, F) Construction Of Structures Made Of Plasterboards, G) Execution Of Thermal Insulation Of Facades, H) Finishing The Facade With Thin-Layer Silicone Plaster, I) Performing Sheet Metal Flashing At The Junction Of The Wall And The Roof, J) Replacing Window And Door Frames And Roof Windows, K) Replacing Window Sills, L) Dismantling Sanitary Equipment In The Bathroom And Kitchen, M) Laying Tiles, N) Purchase And Installation Of: A Shower Tray, Kitchen Sinks, Shower Taps And Sinks, O) Filling Cracks On The Facade, P) Filling In Sheet Metal Work On The Roof, 1.3. Segment Ea) Insulation Of Walls From The Inside And Finishing Of Walls, B) Reconstruction Of Approaches To Radiators And Relocation Of Radiators, C) Filling In Gaps On Walls And Ceilings, D) Priming And Double Painting Of Rooms, Corridors And Staircases, E) Insulation Of The Roof Above The Ground Floor Along With Development, F) Construction Of New Layers Of A Flat Roof: Waterproofing, Thermal Insulation And Laying Felt Felt Heat-Welded,G) Execution Of Sheet Metal Flashings,H) Thermal Insulation Of The Facade,I) Finishing The Facade With Thin-Layer Silicone Plaster,J) Replacement Of Window And Door Frames, And Roof Windows,K) Replacement Of Window Sills,L) Disassembly Of Sanitary Equipment In Bathrooms,M) Laying Tiles,N) Purchase And Installation Of: Toilet Bowls With A Cistern, Urinals And Washbasins, O) Filling The Gaps In The Facade. 1.4. Removal And Disposal Of Rubble, 1.5. Securing And Tidying Up The Area, 1.6. Preparing Documents To Notify The Construction Supervision Authority About The Completion Of Construction, Notifying The Construction Supervision Authority About The Completion Of Construction Together With Obtaining Confirmation Authorizing T
|