Replacement And Maintenance Of The Oil-Hydraulic Groups Of The Guard Valves Of The Ry De Rome, Plate Taille And Eau Dheure Dams • The Dismantling Of The 2 Oil-Hydraulic Groups Of The Guard Valves Of The Drain Pipes Of The Ry De Rome Dam And Their Replacement By A Single Group Sized Accordingly According To The Requirements Described In This Csc; • The Dismantling Of The 2 Oil-Hydraulic Groups Of The Guard Valves Of The Drain Pipes Of The Plate Taille Dam And Their Respective Replacements With Similar Groups Sized Accordingly According To The Requirements Described In This Csc; • Dismantling Of The Oil-Hydraulic Pipes Connecting The Groups To The Butterfly Valve Control Cylinders And Their Replacement With New Aisi 316L Stainless Steel Pipes Going Up To The New Hydraulic Group In Place Of The Old Ones; • Dismantling Of Cable Trays And Their Replacement With New Ones; • The Supply, Wiring, Connection And Assembly In Perfect Working Order Of The Electrical Equipment Necessary For Controlling The Valves Between The Hydraulic Unit, The Cylinders And The Tgbt (Located In The Downstream Chamber); • The Replacement And Supply Of Electrical Equipment Necessary For The Integration Of The New Hydraulic Unit With The Electrical Installation And The Existing Tgbt Are The Responsibility Of The Company; • The Company Includes The Necessary Supplies For Commissioning The Valve Control To Ensure All The Functionalities Requested From The Csc. The Cables Are Replaced By New Ones In Agreement With The Rgie; • Complete Maintenance Of The 2 Oil-Hydraulic Groups Of The Guard Gates Of The Eau D’Heure Dam.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108860738
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.