Elt Installations As Part Of A New Kitchen Construction Within The Existing Property Construction Road/Fence: Disconnect 12 Mast Lights, Extend Cables/Partially. Reassemble; Disconnect/Dismantle 7 Path Lights; 300 M Lf Channel Uv-Proof. On Temporary Fence; Install/Wire 40 Fence Lights; Install 3 Video Cameras On Construction Site (Existing); Lock: Connect 1 Lock Control Cabinet (Provided By Customer) Via Repair Switch; Install 2 Video Camera Locks; Expand 1 Piece Of Fence Technology/Connect To Existing Structure; Install/Wire 16 Data Connections In The Lock Area With Approx. 500M Of Cat.7; Construction Area: 50 M Fire Protection Route Up To 60X100; 100 M Mlar Route Up To 60X200; 5 Pcs Distribution E30/E0; Connect/Wire 14 Pieces Of F90 Lights (Provided By Customer); Install/Wire/Connect 4 Fire Detectors To Existing System; Disconnect 3 Power Cables Up To 150Mm²; Lay 3 Energy Cables With Approx. 800M In The Pipe/On The Gutter Channel/Sleeves; Relay 14 Pieces Of Various Low-Voltage Cables With Approx. 2,600 M.
Contact Information
Address
Weißenburgstraße 6, 97082, Würzburg
Email
vergabe@stbawue.bayern.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108859815
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.