Construction Work – New Sports Hall Altenahr Steel Construction Work. The Construction Project Is Located In Altenahr In The Altenburg District. In The Immediate Vicinity There Is A Primary School, Residential Buildings And Public Parking Spaces. The Property Can Be Accessed On The North Side (School Yard) And South Side (Outdoor Sports Area). There Are Currently Temporary Container Buildings In The Outdoor Sports Area That House A Youth Office And Storage Areas. The Altenahr Municipal Administration Intends To Build A New Multi-Purpose Sports Hall Including A Head Building And A Connecting Building To The School Building In The North Of The Planned Secondary School. The Construction Project To Be Carried Out Here Includes The Sports Hall, The Head Building And The Connecting Corridor. An Almost Square Building Consisting Of A 3-Field Multi-Purpose Sports Hall And A 2-Story Head Building Including Grandstand Areas Is Planned For The Sports Hall. The Floor Plan Dimensions Are Approximately 50.2M X 68.8M. The Planned Attic Height Is Approx. 11.13M. In The Front Building, The Floor Height On The Ground Floor Is Approx. 4.0M And On The 1St Floor Approx. 5.2M. The Hall Area Is Designed On One Floor. The Building Does Not Have A Basement. The Upper Edges Of The Raw Roofs Are Approx. 10.29M (Trh West Side), 9, 25M (Head Building) And 10.35M (Hall Area). An Upstand Is Always Arranged As An Attic Between The Respective Roofs. The Upper Floor Stands Back From The Ground Floor By Approx. 5M Along Axis B. Extensive Greenery Is Installed On All Roof Ceilings. In Addition To The Stands, The First Floor Houses The Visitor Areas (Cloakroom, Toilets) As Well As Technical And Storage Areas. The Changing Rooms, Along With The Associated Sanitary Areas And Other Technical And Storage Areas As Well As A Staircase Can Be Found On The Ground Floor. The Floor Plan Of The Hall Size Is Approximately 29.62M X 49.0M And Can Be Divided Into 3 Separate Hall Areas Using Dividing Curtains Attached To The Roof Structure. In Addition, Other Sports Equipment Such As Ropes, Basketball Hoops And Rings Are Hung On The Roof Structure. In The South Of The Head Building There Is The Entrance Area, Another Staircase And An Elevator As Well As The Adjacent Connecting Corridor To The School Building. Area Of The Building Plot: Approx. 28,292 M2 Area Of Primary School: Approx. 6545 M2 Area Of Sports Hall: Approx. 6495 M2 Area Of Secondary School: Approx. 6,740 M2 Area Of Outdoor Sports Facilities: Approx. Foundations: Base Plate C 25/30, D=40Cm And Shaft Rings (Well Foundation) With A Diameter Of 1.0M To 2.0M On Natural Soil According To Soil Report; Top Welding Membrane Sealing. Individual And Strip Foundations According To Statics External Walls: Reinforced Concrete, D= 25Cm; Prefabricated Reinforced Concrete Parts, D=25Cminner Walls: Reinforced Concrete, D=25Cm; All Other Load-Bearing And Non-Load-Bearing Interior Walls Are Made Of Masonry. Roof Construction On The Ground Floor: Flat Roof As A Solid Reinforced Concrete Ceiling, Thickness: 20-25 Cm Roof Construction On The Upper Floor: Flat Roof As A Solid Reinforced Concrete Ceiling, Thickness: 20-25 Cm Da
Contact Information
Address
Hotel am Roßberg, Roßberg 143
Contact No.
+49 2643-80954
Email
vergabe@altenahr.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108815146
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.