3.1. The Subject Of The Order Is The Implementation Of An Investment Task Titled: Tourist Service Building - Community Center With Land Development And Technical Infrastructure In The Town Of Pałówko. 3.2. The Scope Of Works Under The Task Includes: 1) Preparation Of The Investment Area Along With Securing The Construction Site For The Duration Of The Task, 2) Construction Of A Community Center Building With A Built-Up Area Of 238.04 M2 Along With Internal Installations On Plot No. 116 Rev. Possibly Pałówko, 3) Construction Of External Water And Sewage Installations And Connections. And Internal Supply Line,4) Construction And Installation Of A Drainless Double-Jacketed Tank With A Capacity Of 5 M3.5) Construction And Installation Of A Liquid Gas Tank Installation,6) Hardening Of The Area And Parking Spaces With Openwork Concrete Slabs Filled With Chernozem And Sown With Grass On A Foundation Of Crushed Aggregate 0/31.5 C50/30, Mechanically Stabilized, 25 Cm Thick, And Sand With A Thickness 10 Cm, 7) Construction Of A Place For Waste (Utility Square), In Accordance With The Design Documentation, 8) Accompanying Development Of The Plot Area, Which Should Include: A) Leveling, Topsoiling And Grassing The Entire Surface Of Plot No. 116, B) Dismantling The Existing Fence Along The Eastern Border Of The Plot C) Installation Of 4 Pieces Of Benches With A Length Of Not Less Than 150 Cm, Steel Frame Structure, Powder-Coated In Color Black, Seats Made Of Impregnated Wooden Elements, In A Color Corresponding To The Finish Of The Boards On The Garbage Bin, In Accordance With The Attached Illustrative Photo, D) Installation Of 4 Pieces Of Waste Bins With A Capacity Of Not Less Than 80 Liters, Steel Frame Structure, Powder Coated In Black, Finished With Impregnated Wood Boards, In Accordance With The Attached Illustrative Photo, E) Planting On The Plot Of The Subject Investment In The Place Indicated By The Employer During The Implementation Of The Works, F) Own Management Of Earth Masses Created During The Implementation Of Construction Works, 9) Execution Of Additional Elements, I.E.: A) Installation Of An External Power Socket (400 V) On The Western Wall Of The Building, With An Appropriate Ip Protection Level, B) Installation Of A Corrugated, Double-Walled Protective Pipe With A Diameter Of 40 Mm (Produced In Accordance With The Requirements Of The Pn-En 50626-1:2023 Standard) For The Subsequent Installation Of Optical Fiber On The Section From The Border Of The Plot Perpendicular To The Building, Introducing It To The Room Marked As: 7 Office In The Architectural And Construction Design. C) The Investor Refrains From Moving The Existing Shelter, Which Was Included In The Design Documentation. D) Preparation Of The Necessary Elements For The Installation Of The Liquid Gas Tank, Installation Of The Gas Tank Along With Its Fittings And Connection To The Building, Preparation Of Acceptance Documents, Including Pressure Tests, Electrical Measurements, Udt A
|