|
The Task Includes All Activities Related To The Thermal Modernization Of The Building, I.E. Preparation Of The Construction Site, Demolition And Dismantling Works, Insulation Of The Flat Roof, Replacement Of External Doors, Replacement Of All Windows, Insulation Of External Walls, Modernization Of The Central Heating Installation By Using A Multi-Split Air Conditioner With One External Unit And 4 Internal Units (Res), Replacement Of The Lighting Installation With Energy-Saving Led Luminaires And Installation Of Photovoltaic Panels With A Total Power Of 10.12 Kwp, In Addition As Part Of Energy Management, Room Temperature Controllers Will Be Used In The Central Heating Installation, And Motion Sensors With Presence Sensors Will Be Used In The Built-In Lighting Installation. Moreover, As Part Of The Improvement Of Accessibility, Construction, Assembly And Installation Works Related To The Modernization Of Bathrooms And Sanitary Installations Are Planned, And As Part Of Increasing The Share Of Green Areas, A Green Wall Is Planned. The Order Is To Be Carried Out On Plots Of Land With No. 768 Km. 4 And 767, 766, 765 K.M. 2, Registration Unit 160805_2 Radłów, Registration District 0087 Wichrów. The Subject Of The Order Covers The Following Scope: 1) Demolition Works, Including: Disassembly Of The Roof Covering, Dismantling Of Gutters And Downpipes, A Free-Standing Chimney, Dismantling Of The Gravel Concrete Subfloor And Removal Of Internal Plasters, 2) Earthworks, Foundation Works And Moisture-Proof Insulation, 3) Construction Of A New Roof Covering Together With Insulation And Installation Of Gutters And Downpipes, 4) Installation Of Door Joinery And Window Work, Including Internal Doors And Door Frames, 5) Facade Works, Including: Vertical Insulation, Insulation With Polystyrene, Preparation, Including Priming Walls For Plaster And Laying Facade Plasters,6) Execution Of Floors, Including Moisture And Heat Insulation, Construction Of Cement Floors And Their Preparation For Ceramic Tile Floors, And Then Installation Of Such Tiles Along With Making Plinths,7) Wall Finishing, Including Plasters, Wall Facing And Priming, Laying Gypsum Plasters, Double Painting Emulsion Paint And Filling Ventilation Grilles,8) Installation Of Ceilings Made Of Fire-Resistant Plasterboards, Including Installation Of A Vapor Barrier Foil On The Grid, Priming, Application Of Gypsum Plasters And Double Painting With Emulsion Paint,9) Sanitary Works, Including Installation Of Pipelines, Construction Of Approaches And Sewage Inlets, Installation Of Sanitary Fittings With Faucets, Performance Of Tightness Tests And Flushing The Water Supply System In The Building,10) Electrical Works In The Field Of Electrical Installation And Photovoltaic Installation, Including Installation Of Sockets, Fans, Lighting Fixtures, Switchboard, Circuit Breakers, Disconnectors And Circuit Breakers, Installation Of Photovoltaic Panels, Air Conditioner, Electric Heater And Air Curtain. The Detailed Scop
|