Pipes And Fittings – Ductile Cast Iron Pipes And Fittings Hw Reinekamp. A New Dn 600 (Pn 10) Main Water Pipe Is To Be Built, Predominantly Using An Open Construction Method, In Three Construction Phases In Laatzen. The Construction Phases Have Different Lengths And Are Not Congruent In Execution Times Due To The Local Circumstances And The Associated Structural Complexity. The Entire Renovation Route Is Around 1170 M. The Three Construction Phases Are Listed Below: 1St Construction Phase (Ba): Agnes-Karll-Krankenhaus To Expoweg, Including Crossing Hildesheimerstrasse. Construction Length Approx. 256 M, Mostly Straight, Two Culverts, Culverts At The Agnes-Karll Hospital In Flange Connections, Required Angles Mmk 45° And 90°, Ffk 45°, T-Pieces, Ff-Piece With Wall Flange And Flange Adapter 2Nd Construction Phase: Expoweg To The Werner-Von-Siemens-Straße Exit. Overall Length Around 351 M, Many Bends, A Culvert. Execution Of Two Flaps, Required Angle Mmk 22°, 30°, 45°, Flange Adapter 3Rd Construction Phase: Exit Werner-Von-Siemens-Straße To Kronsbergstraße. Length Approx. 563M, Required Angle Mmk 11°, 22°, 45°, Flange Adapter, For Integration Of T-Piece, Mma, Ff-Piece With Wall Flange
Contact Information
Address
Auf der Papenburg 18
Contact No.
+49 511430-2395
Email
bernd.tobies@enercity.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108786183
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.