|
3.2. The Subject Of The Construction Project Is The Construction Of Ul. Wojska Polskiego (Municipal Road No. 010832C) From Km 0+014.63 To Km 0+251.81. The Total Length Of The Designed Road Is 237.18 M. The Investment Also Includes Expansion Of The Storm Sewage System And Reconstruction Of The Water Supply Network. The Projects Scope Of Works Includes: – Cutting Down Trees And Bushes, – Earthworks, – Covering Of Power And Telecommunications Cables With Split Pipes, – Expansion Of The Storm Sewerage Network, – Reconstruction Of The Water Supply Network, – Height Adjustment Of The Network Fittings. Water Supply, Gas And Sanitary Sewage Systems, – Installation Of Concrete Curbs, Concrete Retainers And Concrete Edges On A Concrete Footing With Resistance, – Construction Of A Road With A Surface Made Of Gray Concrete Cubes, – Construction Of Parking Spaces With A Surface Of Open-Work Concrete Slabs Filled With White Aggregate, – Construction Of Standard Exits With A Surface Of Graphite Concrete Cubes, – Construction Of Access Roads To The Property With A Surface Of Concrete Cubes Yellow, – Construction Of A Roadside With A Dirt Surface, – Construction Of Low Greenery. – The Investment Is Located On Plots With Registration Numbers 3263, 3265 Located Within The Register. [0001] City Of Tuchola, Registration Unit [041606_4] Tuchola – City. – Planned Investment In Accordance With Art. 39 Section 6Ba Pts. 4 Of The Act Of March 21, 1985 On Public Roads (Uniform Text: Journal Of Laws Of 2024, Item 320, As Amended) Does Not Require The Construction Of A Technological Canal. A Detailed Description Of The Subject Of The Order Is Contained In The Documents Listed Below: - Decision No. 6.81.20224 Of The Staroste Of Tuchola, Of December 10, Ref. Bd.6740.6.81.2024.Ag, Regarding The Approval Of The Land Development Design And The Architectural And Construction Design And Granting A Permit For The Construction Of Municipal Road No. 010832C, Wojska Polskiego Street, On The Plots Of Land No. 3263 And 3265 Located In Tuchola, Tuchola Commune, Together With The Expansion Of The Rainwater Drainage Network, Reconstruction Of The Water Supply Network And Construction Exits To Plots No. 3123/2, 3140, 3141, 3142, 3143, 4144, 3145, 3146, 3147, 3148, 3817/13, 3817/15, 3817/17, 3817/19, 3817/21, 3817/23, 3817/25, 3817/27, 3817/29; – Building Design – Area Development Design – Construction Of Municipal Road No. 010832C – Ul. Wojska Polskiego In Tuchola, Together With The Expansion Of The Storm Sewage System And Reconstruction Of The Water Supply Network, – Construction Project – Architectural And Construction Design – Construction Of Municipal Road No. 010832C – Ul. Wojska Polskiego In Tuchola, Together With The Expansion Of The Storm Sewage System And Reconstruction Of The Water Supply Network, - Construction Design - Attachments Of The Construction Design - Construction Of Municipal Road No. 010832C - Ul. Wojska Polskiego In Tuchola, Together With The Expansion Of The Storm Sewa
|