4.1. The Subject Of The Order Is Construction Work On The Investment Task Titled: Modernization Of The Selective Waste Collection Point In Poniatowa Wieś.4.2. The Subject Of The Order Is The Performance Of Construction Works, Which Mainly Include: 1) Preparatory And Demolition Works, Including, Among Others: Dismantling Existing Surfaces Made Of Concrete Slabs, Dismantling Existing Fencing Elements, Including Entrance Gates And A Wicket, Tidying Up The Area And Preparing The Construction Site For The Implementation Of Works, 2) Earthworks, Including In Particular Mechanical Planting And Leveling Of The Area, Construction Of Troughs For Hardened Surfaces, Foundation Slabs And Reinforced Concrete Slabs, As Well As Excavation, Profiling And Compaction Of The Subsoil, 3) Hardening Of The Area, Including The Construction Of Drainage Layers, Bases And Ballasts, Construction Of Surfaces From Concrete Road Slabs And Reinforced Concrete Slabs With A Thickness Of 15 Cm And Construction Of A Band Around The Social Building With Concrete Paving Stones 6 Cm Thick, 4) Construction And Foundation Works, Including The Construction Of Foundation Slabs For Waste Collection Chambers And Shelters, Installation Of Concrete Blocks Separating Waste Collection Chambers And Construction Of Reinforced Concrete Elements Related To Land Development, 5) Construction Of Steel Shelters - 2 Pcs. Including The Construction Of A Shelter For Waste With An Area Of 100.6 M2 (Galvanized Coated Steel Structure, Walls Protected With Trapezoidal Sheet Metal On Three Sides, Single-Pitch Roof Covered With Trapezoidal Sheet Metal) And Shelters For Large-Size Waste With An Area Of 51 M2 (Galvanized Coated Steel Structure, On Three Sides Of The Shelter There Are Walls Made Of Concrete Blocks With A Height Of 1.8 M, Single-Pitched Roof Covered With Trapezoidal Sheet Metal),6) Construction Works In Two Buildings, Including Renovation And Thermal Modernization Of A Social Building With A Built-Up Area Of 75.12 M2, Renovation Of A Technical Building With A Built-Up Area Of 25.21 M2, Execution Of Thermal And Moisture-Proof Insulation, Facade Works With Plasters And Sheet Metal Work, As Well As Replacement And Installation Of Window And Door Joinery,7) Construction Of Fencing Of The Area, Including Installation Of A Concrete Fence, Two Gates Double-Leaf Entrances And One Entrance Gate,8) Land Development, Including The Installation Of One Truck Scale, Installation And Placement Of Containers - 5 Pcs. And Waste Containers - 10 Pcs., As Well As Construction Of An Insulating Green Belt - 40 Pcs.,9) Installation Works In The Field Of Electrical And Power Installations, Including The Construction Of Low-Voltage Cable Power Lines Supplying The Social Building, Technical Building And External Devices, Construction Of Internal Power Supply Lines And Switchboards, Area Lighting Installations - 5 Lighting Poles, Video Monitoring Installations And Grounding, Anti-Shock And Overvoltage Protection Along With T
|