|
I. The Subject Of The Order Is The Development Of The Area At Ul. Prusa 16/18 - Stage I, As Well As The Construction Of Green Screens On The Premises Of Primary School No. 8 At Ul. Pescantina 2 In Siedlce The Scope Of The Order Includes: 1) General Construction Works, Including Earthworks, Demolition And Preparatory Works, Construction Of A Relief Slab Over The Retention Tank, Construction Of Casing For Existing Units, Construction Of A Sidewalk Made Of Concrete Paving Stones, Repairs Of The Surface After Installation Works, Construction Of Installation Culverts, Demolition Of Part Of The Steel Shelter, Construction Of Building Plinths From The Side Courtyard, 2) Sanitary Works, Including Connection And External Rainwater Drainage System, Installation Of A Retention Tank, Construction Of Drainage, Reconstruction Of The External Sanitary Sewage System, Connection Of Water And Sewage And Central Heating To The Reception Building, 3) Greenery: Cuttings, Plantings, 4) Greenery: Green Screens In The Area Of Primary School No. 8 At Ul. Pescantina Siedlce - Location In Accordance With The Map Attachment. Additional Information Regarding The Subject Of The Order: 1. The Detailed Scope Of Works Is Presented In The Design Documentation (Land Development Design, Architectural And Construction Design And Technical Designs, Technical Specifications For The Execution And Acceptance Of Works), Which Is An Annex To The Specifications Of The Terms Of The Order, While The Bills Of Quantities Should Be Treated As Additional, Auxiliary Annexes Design Drawings. The Occurrence During The Implementation Of The Contract Of Works Not Included In The Bill Of Quantities Or Works In A Larger Quantity Than The One Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation Or Stwiorb.2. All Documents Describing The Subject Of The Contract Should Be Treated As Mutually Complementary And Explanatory In The Sense That In The Event Of Any Ambiguities Or Ambiguities, The Contractor May Not Limit The Scope Of His Obligations Or The Scope Of Due Diligence In The Performance Of His Obligations Resulting From Them. From The Public Procurement Contract.. 3. The Contractor Is Obliged To: A) Carry Out Construction Works In Accordance With The Terms Of Decision No. 129/2023 Of September 18, 2023, B) Carry Out Construction Works In Accordance With The Terms Of Decision No. 460/Saab /2023 Of July 11, 2023, C) Carry Out Construction Works In Accordance With The Conditions Specified In Decision No. 93/Ds/23 Of February 21, 2023, Decision No. 640/Ds/2024 Of November 19, 2024 And Decision No. 580/Ds/2025 Of December 17, 2025 D) Carrying Out Felling And Planting In Accordance With Decision No. 31/Ds/2023 Of January 18, 2023, Decision No. 184/Ds/2024 Of April 17, 2024, Together With Resolution No. 250/Wz/2024 Of July 8, 2024 And Decision No. 565/Ds/2025 Of December 16, 2025, E) Obtaining A Permit
|