|
Construction Work – Városliget Branching – Kőbánya-Teher Renovation. Renovation Of The 100 Budapest – Szolnok – Debrecen – Nyíregyháza – Záhony Railway Line, Városliget Branch – Kőbánya-Teher Section ~ 2.5 Km Long, Electrified, Gap-Free, Double-Track Railway Line. The Permitted Speed For The Line Section Is 80 Km/H. The Maximum Permissible Axle Load Is 210 Kn. In Terms Of Suburban And Long-Distance Passenger Traffic, It Is One Of The Most Important Line Sections In The Country, On Which Freight Traffic Is Also Significant. Its Most Recent Comprehensive Renovation Took Place In The Early 1970S, And Accordingly The Entire Infrastructure Is Outdated, As A Result Of Which It Can Only Be Walked At A Speed Of 40-60 Km/H. The Line Of The Track Was Mostly Built In The 1940S, On A 4-5 M High Embankment Built In An Urban Environment, While It Runs At Ground Level In The Vicinity Of The Stations (Kőbánya-Teher, Kőbánya-Kispest). There Are A Significant Number Of Large-Scale Artefacts On The Section Along The Embankment (Thököly Út, Egressy Út, Mogyoródi Út, Kerepesi Út). The Horizontal Line Is Characterized By The Track Widening In The Vicinity Of The Island Platform Stop (Zugló), And The Typical Line Track Axis Distance Is 4.00 M. Main Tasks Of The Winning Bidder (With Quantitative Data) Railway Track (Substructure And Superstructure): - Superstructure Replacement With Earthmoving Technology, Substructure Repair, Superstructure Without Gaps: 2152 Mfm; - Bedding Screening: 2798 Vfm; - Gapless Track Replacement: 2798 Vfm; - Writing Works: 25,600 M2; - Preparation Of Necessary Technological Plans. Artifact: - Renovation Of A Steel Structure Bearing A Railway Load: 6 Pieces; - Renovation Of A Reinforced Concrete Structure Bearing A Railway Load: 5 Pieces, - Preparation Of Necessary Technological Plans. Safety Equipment: - Preparation Of Necessary Technological Plans. Telecommunications: - Protection Of Cables: Approx. 50 M; - Cable Routing On Works Of Art: 9 Pieces. -- Preparation Of Necessary Technological Plans. Power Current: - Replacement Of Weight Posttensioners: 8 Pieces; - Replacement Of Insulators In The Length Chains: 100 Pieces; - Protection Of Columns Against Corrosion: 680 M2; - Replacement Of Overhead Line Length Chains: 5505 Fm; - Renovation Of The Primary Equipment Of 1 Máv 10/0.4 Kv Transformer Station: 1 Activity. - Preparation Of Necessary Technological Plans. The Tenderers Technological Plan Means The Following: The Totality Of All Plans That Are Necessary For The Bidders Construction Processes, Related To The Product Offered By The Contractor Or The Application Of Construction And Organizational Technology. The Technology Plan Can Be Part Of The Technology Instruction, But It Can Also Be Implemented Independently. For More Information, See: Technical Description In Order To Define The Subject Of The Public Procurement In A Clear And Understandable Way, Ak May Refer To The Make, Origin, Type Of Thing, Process, Activity, Person, Or Patent Or Trademark Specified In This Notice And In Other Kd. In All Such Cases, The Designation Was Made Only In Order To Clearly Define The Nature Of The Object, The Offer Prescribed In This Invitation, Or The Thing With The Given Make, Origin, Type
|