Architectural And Related Services – General Renovation Of The Wittelsbach Sports Hall With Meeting Place In Fürstenfeldbruck. The Wittelsbacher Hall Is A Triple Sports Hall For The Ferdinand V. Miller Secondary School, The State Vocational School And The Technical High School. On The Occasion Of A Feasibility Study By Balda Architekten Gmbh From May 2025, A General Renovation Is To Be Carried Out With The Following Renovation Areas: Energy-Related Renovation Of The Building Envelope: Insulation Of The Earth-Covered Roofs In The Area Of The Equipment Rooms And Changing Rooms, Including Exposing The Components, New Insulation And New Sealing. Roof Surfaces And Roof Skylight: Scaffolding With Roofers Catch, Dismantling Of The Existing Roof Covering With Insulation. Renewal Of Thermal Insulation And Roof Structure. New Roof Covering As Sheet Metal Covering To Save Load Compared To Tile Covering. Renewal Of The Roof Skylight Including Construction As A Post-Transom Facade With Installation Of Smoke Exhaust Openings With A Clear Opening Cross Section Of 1% Of The Hall Floor Area. Post-Transom Facade, Doors And External Wall In The Ground Floor Toilet Area: New Glazing Of The Existing Post-Transom Facade With New Thermally Improved Cover Strips. Renewal Of All Doors In The Facade Area. Power Operation Of An Entrance Door For Barrier-Free Access. Renewal Of The Sheet Metal Cladding In The Area Of The Toilet Core On The Ground Floor Including Replacement Of The Insulation In This Area. Insulation Of Walls Against Unheated Areas And Against Soil. Internal Insulation With Drywall Facing Of The Walls Against The Ground In The Area Of The Equipment Rooms And Internal Insulation Of The Partition Walls To Technical Rooms In The Basement. Replacement Of Doors To Technical Rooms. Internal Insulation In Parts Of The Hall Area In Contact With The Ground Behind The Impact Wall. Measures To Improve Fire Protection: Creation Of A Necessary Stairwell On The Ground Floor By Separating The Tr1 Staircase With Stb Inner Walls And Stb Ceiling From The Hall. Installation Of A Door Between The Hall And Tr 1. Installation Of A Smoke Exhaust Opening Above The Roof. New Glazing Of The Escape Stairs Tr 2 And Tr 3. Towards The Hall With The Aim Of Creating A Smoke-Tight Connection To The Hall. Replacement Of Interior Doors In Accordance With Fire Protection Requirements That Do Not Meet Any Fire Protection Requirements In The Existing Building. Conversion Measures To Renew Building Technology: Structural Measures To Replace The Ventilation System And To Clean Up Pollutants In The Fire Dampers. Structural Measures To Renovate The Sanitary Facilities. Dismantling Existing Facing Shells And Floor Structures. New Construction Of The Facing Shells And Reinstallation Of The Floor Structures. Tile Work. Other Work Renewal Of Building Technology: Demolition Of Chimneys, Equipment Foundations, Earthworks And Installation Of A Room Scaffolding In The Entire Hall Area. The Spatial Scaffolding Is Also Available For All Necessary Work On The Roof Structure Of The Hall. Enclosure Of New Ventilation Unit: Enclosure Of A New Ventilation Unit In Wooden System Construction On The Flat Roof Of The Existing Technical Center In The Basement. The Enclosure Is Necessary Because There Is Not Enough Space For The Additional Ventilation Unit Required
Contact Information
Address
Münchner Straße 32
Contact No.
+49 81415190
Email
hochbau@lra-ffb.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108715824
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.