|
Empanelment Of Consultant For Preparation Of Detailed Estimate Of Roads And Building Works For The Rural Roads Under Panchayat (R&B) Division, Navsari.- Level Survey Work Along The Road Alignment For Preparation Of Field Book, Longitudinal Section, Cross Section Etc. Complete As Directed. (Hard & Soft Copy) Using Total Station/Dgps, Using Dumpy Level, Carry Out Traffic Survey And Preparing And Submit Reports To Competent Authority (Hard & Soft Copy), For Three Days, For Seven Days, Carry Out Atcc 24 Hours Three Days Traffic Survey And Preparing And Submit Reports To Competent Authority (Hard & Soft Copy), For Three Days, For Seven Days, Contour Survey Work (Using Total Station/Dgps) Including Preparation Of Necessary Records, Drawings Etc. Complete As Directed. (Hard & Soft Copy), Survey Work For Preparing Road Charts A-B-C Including Preparation Of Necessary Records, Drawings Etc. Complete As Directed. (Hard & Soft Copy), Photograph (8X4) (Hard And Soft Copy), Carrying Out Detailed Road Safety Survey Work Including Location And Position Of Deference Type Of Road Sing Boards Drawing Details And Submitting All Details For Drawing In Soft Copy In Cd / Pen Drive And Mail In Autocad Drawing Above 2010 Version, Preparation Of Survey, Detailed Plan, Estimate & Standard Bid Document For Resurfacing Of Road As Per Approved Treatment With Instructions By Engineer In Charge Including All Necessary Survey Work Along The Road For Road Work And Necessary Structures Including Designing And Drawings Of Them Without Steel Design (Considering Pipe Drain Works & Protection Works) And Getting It Approve By Competent Authority And Submit It In Soft Copy As Well As Required Hard Copies.For , For ≫3.75M Width Road, Preparation Of Survey, Detailed Plan, Estimate & Standard Bid Document For Widening And Strengthing Of Road As Per Approved Treatment With Instructions By Engineer In Charge Including All Necessary Survey Work Along The Road For Road Work And Necessary Structures Including Designing And Drawings Of Them Without Steel Design (Considering Pipe Drain Works & Protection Works) And Getting It Approve By Competent Authority And Submit It In Soft Copy As Well As Required Hard Copies.For Widening Upto 5.5M Width Road, For Widening Upto 7.0M Width Road, For Widening Upto 10.0M Width Road, Preparation Of Detailed Plan, Estimate & Standard Bid Document For Earthen To Bt Road As Per Approved Treatment With Instructions By Engineer In Charge Including All Necessary Survey Work Along The Road For Road Work And Necessary Structures Including Designing And Drawings Of Them Without Steel Design (Considering Pipe Drain Works & Protection Works) And Getting It Approve By Competent Authority And Submit It In Soft Copy As Well As Required Hard Copies.For ≪ Equal 3.75M Width Road, For ≫3.75M Width Road, Preparation Of Detailed Plan, Estimate & Standard Bid Document For Below As Per Department Standards Considering Instructions By Engineer In Charge Including All Necessary Survey Work (Excluding Bore Data) For Structures Including Designing And Preparing Drawings Of Them With Steel Design Where Required With Approval Of Same By Competent Authority As Directed And Submit In Required Hard Copies And Soft Copy. Pipe Drains/ Culverts, Slab Drains/ Culverts, R.C.C. Box Culverts, Cause-Way, Protection Wall, Preparing Standard Bid Document As Per The Sanctioned Estimates Including Applicable Relevant Clauses, Specification, Latest Government Resolutions, Schedule-A, Schedule-B, Schedule-C, Pol Statements And All Other Schedules Related To Standard Bid Document (Sbd) Etc. Complete As Per Department Proactive And As Directed By Engineer In-Charge In Required Number Of Copies And Getting Approval From Competent Authorities. For Tenders Where Pre Qualification Is Not Required. (Dtp Amount Upto 100.00Lacks), For Tenders Where Pre Qualification Is Not Required.(Dtp Amount Upto 500.00Lacks), For Tenders Where Pre Qualification Is Not Required (Dtp Amount More Than 500.00Lacks), For Tenders Where Pre Qualification Is Required., Survey & Preparing Campus Plan Drawing (Using Total Station) Details Of All Existing Structure Plan, Boundary, Location Of Utility Like Electricity, Drainage, Water Supply Etc. Of Trees Etc And Submitting All Details In Soft Copy In Cd / Pen Drive And Hard Copy In Autocad Drawing Above 2010 Version., Preparing Estimate For Construction Of New Building (With All Necessary Ancillary Work) Including All Survey Any Required And Scrutinizing The Estimate As Per Instruction Of Sanctioned Authority With All Required Necessary Drawing And Other Details The Required Ra & Quotation Etc. (Submitting All Details In Soft Copy In Cd / Pen Drive And Hard Copy In Required Set) Including Getting Technical Sanction From Competent Authorities. Estimated Cost Up To Rs. 10 Lacs, Estimated Cost Rs. 10 Lacs To 15 Lacs, Estimated Cost Rs. 15 Lacs To 50 Lacs, Estimated Cost Rs. 50 Lacs To 100 Lacs, Estimated Cost Rs. 100 Lacs To 200 Lacs, Estimated Cost Rs. 200 Lacs And Above, Surveying & Preparing Plan, Elevation Section Of New Building And Existing Building And Submitting All Details In Soft Copy In Cd/Pen Drive And Hard Copy In Auto Cad Above 2010 For G.F., Extra For Each Additional Story Of Building, Preparing Estimate For Repairing Of The Existing Building As Per Instruction Of Engineer In-Charge (With All Necessary Ancillary Work) Including All Survey Required And Scrutinising The Estimate As Per Instruction Of Sanctioning Authority With All Required Necessary Drawings Photograph And Other Details Like Required Ra & Quotation Etc. (Submitting All Details In Soft Copy In Cd/Pen Drive And Hard Copy In Required Set) And Get Technical Sanction From Competent Authorities. Estimated Cost Up To Rs. 10 Lacs, Estimated Cost Rs. 10 Lacs To 15 Lacs, Estimated Cost Rs. 15 Lacs To 50 Lacs, Estimated Cost Rs. 50 Lacs To 100 Lacs, Preparing And Providing Structure Design According To Indian Standards And Directions By Design Circle For The New Construction Of Building As Well As Submission Of Other Relevant Details As Per Directed By The Engineer In-Charge Including Obtaining Approvals For The Same From Competent Authority. Finally Submitting All The Approved Designs And Drawings In Soft Copy And Hard Copies As Directed., Preparing Standard Bid Document As Per The Sanctioned Estimates Including Applicable Relevant Clauses, Specification, Latest Government Resolutions, Schedule-A, Schedule-B, Schedule-C, Pol Statements And All Other Schedules Related To Standard Bid Document (Sbd) Etc. Complete As Per Department Proactive And As Directed By Engineer In-Charge In Required Number Of Copies And Getting Approval From Competent Authorities.Estimated Cost Up To Rs. 10 Lacs, Estimated Cost Rs. 10 Lacs To 15 Lacs, Estimated Cost Rs. 15 Lacs To 50 Lacs, Estimated Cost Rs. 50 Lacs To 100 Lacs, Estimated Cost Rs. 100 Lacs To 200 Lacs, Estimated Cost Rs. 200 Lacs And Above, Preparing Estimate For Furniture Of New Building & Existing Building With All Necessary Details Including Scrutinizing The Estimate As Per Instruction Of Sanctioned Authority With All Required Necessary Drawings & Other Details And Getttind Technical Sanctioned From Competent Authorities.(Submitting All Details In Soft Copy In Cd / Pen Drive And Hard Copy In Required Sets) Estimated Cost Up To Rs. 25 Lacs, Estimated Cost Rs. 25 Lacs To 50 Lacs, Estimated Cost Rs. 50 Lacs To 100 Lacs, Estimated Cost Rs. 100 Lacs To 150 Lacs, Estimated Cost Rs. 150 Lacs To 200 Lacs, Estimated Cost Rs. 200 Lacs And Above
|