1. The Subject Of The Order Is The Modernization Of Entrance Terraces To First-Floor Residential Premises In A Multi-Family Residential Building At Ul. Lipowa 23-24 In Gorzów Wlkp., In Accordance With The Technical Specification For The Execution And Acceptance Of Works.2. The Scope Of Work Includes In Particular;2.1. Construction Of Safety Canopies,2.2. Scaffolding,2.3. Dismantling: Concrete Paving Slab Floors, Concrete Subfloor, Terrace Insulation, 2.4. Removing Unevenness In Concrete, Cleaning Walls, Preparing The Ground As Part Of The Repair Of Reinforced Concrete Structures, 2.5. Removal Of Rubble And Disposal Of Concrete, 2.6. Anti-Corrosion Protection Of Reinforcing Steel, Double Painting Of Metal Elements, 2.7. Leveling Cement Plasters - Floor Plinths, 2.8. Reprofiling Of The Substrate,2.9. Welded Reinforcing Mesh, 2.10. Quick-Setting Concrete Base, Manual Laying Of Terrace Slabs On The Ceiling, 2.11. Making Cement Screeds,2.12. Leveling The Front Strip Of 30 Cm Wide Terraces Made Of Concrete With Styrofoam Boards. 5 Cm., Protection Of The Convex Corners Of The Front Strip With A Metal Angle, Painting The Facade - Front Strip, 2.13. Polyurethane Protective Coatings For Slab-Wall, On Terraces - Polyurethane Resins, + With A Sprinkle Of Colored Quartz Sand, Varnishing, 2.14. Strengthening And Painting Balustrades On Terraces, 2.15. Welding Of Shaped Steel, Pipes, Attention! The Works Will Be Carried Out On An Active, I.E. Inhabited, Facility. The Ordering Party Will Provide The Contractor With Access To Utilities (Water And Electricity), The Cost Of Consumption Is Borne By The Contractor; Settlement Will Be Made According To Meter Readings. The Ordering Party Is Not Able To Provide A Room For Storing Equipment And Construction Materials.3. The Ordering Party Requires The Involvement Of A Person With Authorization To Manage Construction Works Specified In The Provisions Of The Construction Law In The Field Of Construction, Therefore The Cost Associated With The Involvement Of The Construction Manager Must Be Included In The Offer Price.4. Documents Describing The Subject Of The Order Should Be Treated As Mutually Explanatory And Complementary In The Sense That If Any Ambiguities Or Ambiguities In Performance Are Found, The Contractor Will Not Be Able To Limit The Scope Of His Obligation Or The Scope Of Due Diligence.
|