|
Work Sign In Dimensions Of 3.0 3/4 Conf. Cesan, 06/02/2026 - 15:34:10, Sewage Network, Containing Tank And Filter, Incl, Light Network, Incl. Default Input. Three-Phase Energy. Cable Connection To, Demolition Of Simple Concrete With Hammer, Mechanized Removal Of Asphalt Coating, Removal Of Iron Plug, Transport With 10 M³ Dump Truck - Highway 1, Mechanical Excavation Of Trench In 1St Category 1 Material, Commercial Sand Ballast - Mechanical Spreading, Backfilling And Compaction With Vibrating Socket, Loading, Maneuver And Unloading Of Soil And Granular Materials 1, Transport With A 10 M³ Dump Truck - Highway 2, Drain Box In Pre-Molded Blocks And Hinged Grid In Ffa, Hdpe Pipe For Drainage - D = 400 Mm - Supply E, Concrete Curb - Mfc 01 - Commercial Sand And Crushed - Formwork, Transport With Truck Body With A Capacity Of 11.5 T, Regularization Of The Subgrade - 100% Intermediate Proctor, Base Or Sub-Base Of Graded Crushed Stone With Commercial Crushed Stone - 100%, Execution Of Flooring On An Interlocking Floor, Concrete Fck = 25 Mpa - Preparation In A Concrete Mixer And Launching, Maneuvering And Unloading Of Soil And Granular Materials 2, Transport With A 10-Inch Dump Truck M³ - Highway 3, 5 T 1, Priming With Asphalt Emulsion, Supply Of Asphalt Emulsion For Priming (Eai), Commercial Crushed Ballast - Mechanical Spreading, Maneuvering And Unloading Of Soil And Granular Materials Concrete With, Hydraulic Tile Floor Applied In External Environments., Strip Painting With Thermoplastic By Spraying - Thickness, Painting Of Arrows And Zebras With Thermoplastic By Spraying -, Support For Signage Plate In Treated Hardwood 8 X, Plastic Cone For Traffic Channeling - Use Of 150, Directing Or Blocking Device Type Plastic Screen, Signage For Construction Sites Mounted On Metal Easel, Local Administration, Steel Sign - Film I + I - Supply And Implementation
|