The Subject Of The Order Is The Modernization Of The Water Supply Network In The Zbójno Commune By Building A New Water Supply Network In Działyń And Implementing Monitoring Of The Water Supply Network With The Replacement Of Some Water Meters In The Zbójno Commune With Water Meters With A Module - Remote Stationary Reading, With A Pressure Measurement Campaign On Hydrants. The Subject Of The Order Includes: 1) Construction Of A Water Supply Network: - Water Supply Network Made Of Pe Rc Sdr Pipes. 11, Journal 160 Mm X 14.6, Sdr 11, Pn 16 – L=1533.0 M; - Water Supply Network - Branches Made Of Pe Rc Sdr Pipes 11, Journal Of Laws 110 Mm X 10.0, Sdr 17 – L=486.50 M; - Water Supply Connections To Buildings Made Of Pe Pipes, Journal Of Laws 63-32 Mm – L=1112.0 M; - Connection Of The Power Supply To The Planned Water Supply Network With The Existing Water Supply Network In The Cadastral Area 0003 Działyń, 2) Implementation Of Monitoring Of The Water Supply Network With The Replacement Of Some Water Meters In The Zbójno Commune With Water Meters With A Module - Remote Stationary Reading, With A Pressure Measurement Campaign On Hydrants: - Replacement Of 29 Water Meters In The Area Of Działyń With Water Meters Volumetric, Adapted For Stationary Reading (Including 25 Pcs. Dn 15 Mm, 3 Pcs. Dn 20 Mm, 1 Pc. Dn 40 Mm Fire Protection); - Development Of A Hydraulic Model Of The Water Supply Network; - Implementation Of The Gis System - Gis System (Geographic Information System); - Division Into Dma Zones, I.E. Separation Of The Zone - Działyń; - Installation Of Pressure Measurement Points - Installation Of Pressure Measurement Points In The Water Supply Network Enables Ongoing Monitoring Of Network Operating Parameters And Provides Data For Calibration Of The Hydraulic Model Of The Water Supply Network, - Conducting A Measurement Campaign - Performance Tests Of Hydrants. Hydrant Performance Tests Will Allow You To Assess The Efficiency Of The Water Supply Network And The Readiness Of Selected Hydrants For Firefighting Operations. This Campaign Will Provide Data For Calibration Of The Hydraulic Model And Identify Possible Problems With The Infrastructure. The Subject Of The Order Regarding The Construction Of The Water Supply Network Is Specified In The Land Development Design, Technical Specification For The Execution And Acceptance Of Works, And The Bill Of Quantities, While The Subject Of The Order Regarding The Implementation Of Monitoring Of The Water Supply Network Is Specified In The Description Of The Subject Of The Order. The Bill Of Quantities Is An Auxiliary Element In Determining The Price. Due To The Fact That The Works Contract Will Be A Lump Sum Contract, In The Event Of A Larger Number Of Works In Any Item During The Works, It Will Not Be Considered Additional Works With A Demand For Additional Remuneration. The Possible Absence Of Certain Works Necessary To Be Performed On The Basis Of The Design Documentation In The Bill Of Quantities Does Not
Contact Information
Address
Gmina Zbójno,Zbójno,87-645,Kujawsko-Pomorskie,Pl616 - Grudziądzki
Contact No.
542801921
Email
bip@zbojno.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108555989
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.