|
1. The Subject Of The Order Is The Development Of Design Documentation Along With The Necessary Arrangements And Permits, And The Performance Of Construction Works Based On It To Improve The Energy Efficiency Of A Two-Story Public Building At Ul. Kolejowa 8 In Strumień As Part Of The Task Entitled: Improvement Of The Energy Efficiency Of The Public Utility Building At Ul. Kolejowa 8 In Strumień In The Design And Build Formula.2. The Subject Of The Order Includes, Among Others: 1) Preparation Of Design Documentation For All Necessary Industries, In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Consolidated Text: Journal Of Laws Of 2021, Item 2454 And The Minister Of Development Of July 12, 2022 In Regarding The Detailed Scope And Form Of The Construction Project (I.E. Journal Of Laws 2022, Item 1679 And The Construction Law Act Of April 1, 2025 (I.E. Journal Of Laws 2025, Item 418), Including: A) Obtaining All Administrative Decisions, Opinions And Arrangements Required For The Implementation Of The Investment In Question, Including Decisions Issued By The Provincial Office For The Protection Of Monuments In Katowice Due To Locating The Building In The Urban Layout Of Strumien According To The Decision On The Entry Of Monuments Of April 28, 1981 (Register No. A-391/81), B) Construction Design, C) Detailed Design, D) Technical Design (If Required), E) Bills Of Quantities For All Industries, F) Cost Estimates For All Industries, G) Collective Cost Statement, H) Technical Specification For The Execution And Acceptance Of Works Construction I) Obtaining A Building Permit Decision/Notification Of Construction Works, J) Preparation Of The Construction Site. 2) Implementation Of Construction Works In Accordance With The Construction Law Of April 1, 2025 (Consolidated Text: Journal Of Laws Of 2025, Item 418), Including: A) Thermal Insulation (Insulation) Of External Walls Along With Thin-Layer Plasters, B) Thermal Insulation (Insulation) Of Foundation Walls 50 Cm Below Ground Level, C) Thermal Insulation (Insulation) Of The Roof/Flat Roof Along With The Implementation Of A New Roof Covering And Replacement Of All Sheet Metal Flashings And Lightning Protection Installation, D) Replacement Of Window Frames, E) Replacement Of External Doors, F) Replacement Of The Central Heating Installation, G) Reconstruction Of The Internal Hot Water Installation, H) Reconstruction Of The Heat Source With The Inclusion Of Technology Based On Renewable Energy Sources By Installing Solar Collectors With Buffer Tank (Heat Storage), Operating Together With A New Heating Node Powered By A Local Heating Plant And An Energy Management System, I) Reconstruction Of The Internal Electrical Installation To The Necessary Extent, Along With Accompanying Works. 3
|