|
1. The Subject Of The Order Is The Performance Of Works Under The Task Entitled: Modernization Of Small Architectural Objects In The Kampinos Commune.2. The Task Involves Rebuilding The Fountain And The Relaxation Area By Installing Two Solar Picnic Tables. The Scope Of The Investment Also Includes The Dismantling Of The Existing Fountain, I.E. Dismantling The Stone (Boulder) From Which Water Gushes Out, Dismantling The Existing Drainage Layer, Paving Stones And Rebuilding The Underground Water Storage Tank. Additionally, The Dismantling Of Two Park Benches And The Installation Of Two Sets Of Solar Picnic Tables With Benches Are Planned. The Said Task Will Be Carried Out In The Town Of Kampinos, Kampinos Commune, On Plot No. 77/3 In Kampinos, Where There Is Also A Fenced Playground, A Climbing Wall, An Outdoor Outdoor Gym, A Container Building, And Concrete Pavements. The Designed Devices And Elements Of The Planned Reconstruction Should Be Installed In Accordance With The Instructions Of The Selected Manufacturer Of A Given Device On Prefabricated Elements Provided By The Manufacturer In Accordance With The Pn-En 1177:2009 Or Equivalent Standard. The Devices Should Be Made Of Elements Resistant To Weather Conditions, Including Metal Parts Hot-Dip Galvanized On Both Sides Or Made Of Stainless Steel. Galvanized Metal Elements Should Be Powder Coated. The Exact Location Of The Devices Is Shown In Drawing No. 2 Of The Land Development Project For Plot No. 77/3 In Kampinos, Which Is Attached As Appendix No. 12 To Swz.3. The Investor Also Has A Certificate Issued By The Staroste Of Warsaw West On March 26, 2025, Confirming The Lack Of Grounds To Raise An Objection To The Submitted Notification Of Construction Or Performance Of Construction Works (Annex No. 12 To Swz) Consisting In Construction Of Small Architecture (Construction Of Picnic Tables And Reconstruction Of The Fountain) In The Scope Of The Project Entitled Modernization Of Small Architectural Objects In The Scope Of Reconstruction Of The Fountain And The Zone Recreation (Case Reference Number: Ab.6743.226.2025.Je).4. All Devices Should Be Intended For Public Squares And Have A Certificate Issued By An Accredited Body Or A Declaration Of Conformity. The Devices Must Not Have Sharp Edges Or Gaps That Could Allow For Fingers To Get Stuck. Pcs. A) Structure Made Of Hot-Dip Galvanized And Powder-Coated Steel Profiles, Intended For A Total Of 6 People (Bench Length Approx. 180 Cm), B) Wooden Filling Of The Benches And Table (Oak, Ash) Protected With Impregnation, C) Panel Power: 2 X 320 W, D) 2 X Gel Batteries, Deep Discharge, 12Ah, E) Lighting. Led, Switched On Using A Motion/Dusk Sensor. F) Usb Sockets 4X5v, Max. 2A, G) Bicycle Racks, Min. 2 Pcs., H) 12V Socket, I) Wifi Access - Built-In Wi-Fi Router, Internet Provided By The Ordering Party, J) Wireless Charger, Min. Preparatory Works, • Necessary Hardening Of The Area With Concrete Or Stone Slabs (Flamed Strzegom Granite Slabs With Dimensions
|