|
Structural Shell Work – Kke 303 Shell Work - Construction Work By The Bundeswehr, Elb-Havel Barracks, New Factory Building (Nbb-2026-0035). The Following Approximate Information On The Shell Construction Work Is Listed: About The Workshop Earthworks: - 1800 M3 Of Earth Excavation Work For The Construction Pit, Floor Slab Etc., - Filling 1000 M3 Of Work Space, - Disposing Of 3.5 T Of Soil, Stones, Dredged Material, - Individual Services For Drainage And Underground Pipe Construction Sealing Work: - 200 M2 Of Sealing Of Walls In Contact With The Ground, Including Perimeter Insulation, - 1700 M2 Sealing Of Floor Slabs In Contact With The Ground Scaffolding Work (Partly For Ag/Other Entrepreneurs): - 1600 M2 Work/Facade Scaffolding, Height Up To 9 M, Including Holding Times, - Individual Mobile Scaffolding, Concrete Work, Including Formwork And Reinforcement: - 417 M3 Bucket Foundations Made Of In-Situ Concrete, - 1700 M2 In-Situ Concrete Floor Slab With Hard Material In Surface, - 40 Pcs Supports Prefabricated Concrete Parts, - 20 Pcs Gable Roof Trusses Prefabricated Concrete Parts, - 200 M2 Wall Panels Prefabricated Concrete Parts, - 650 M2 Wall Panels Made Of Aerated Concrete, For Cultivation Earthworks: - 1500 M3 Excavation Work For Construction Pit, Floor Slab, Strip Foundations Etc., - 1000 M2 Frost Protection Layer, - 1000 M2 Capillary-Breaking Layer, - 3 T Soil, Dispose Of Stones, Dredged Material, - Individual Services For Dewatering And Underground Pipeline Construction Sealing Work: - 300 M2 Of Sealing Of Walls In Contact With The Ground, Including Perimeter Insulation, - 1700 M2 Of Sealing Of Floor Slabs In Contact With The Ground Scaffolding Work (Partly For Ag/Other Entrepreneurs): - 2500 M2 Of Work/Facade Scaffolding, Height Over 7 To 10 M, Including Holding Times, With Construction Hoist, - 300 M3 Of Area-Oriented Scaffolding, - 3800 M3 Of Load-Bearing Scaffolding Of Design Class B, Including Retention Times, Masonry Work: - 750 M2 Of Masonry Made Of Sand-Lime Brick (Mainly Interior Walls), Concrete Work, Including Formwork And Reinforcing Steel: - Various Individual And Strip Foundations Made Of In-Situ Concrete, - 1300 M2 Of In-Situ Concrete Floor Slab, - Various Beams, Beams And Supports Made Of In-Situ Concrete, - 350 M2 In-Situ Concrete Partition Wall, - 1300 M2 Prefabricated Concrete Wall Made Of Element Wall Panels, With Filling Concrete, - 2400 M2 Prefabricated Element Ceiling Slab, With Top-Up Concrete, - Prefabricated Stairs For 2 Stairwells, - Various Built-In Parts For Electrical, Plastering Work: - 300 M2 Interior Plaster On Walls - Lime Cement Plaster
|