Road Construction Works - Kiskundorozsma Industrial-Private Road Infrastructure. The Most Important Tasks And Quantities (The Determining Types Of Work, Capacity Requirements, Volumes, Quantities) In Relation To The Expected/Emerging Demands At The Same Time: - ~3500 M Long, 2X1 Traffic Lane, 6 M Pavement Width (Closed By A Barrier/Gate), ~ 21,000 M2 Asphalt Paved Road - Tree Felling, Shrubbery - Building Demolition - 2 Roads Suitable For Road Loads Bridge Construction (1 Pc 22.10 M Largest Span, Multi-Support; 1 Pc 17.00 M Largest Span, Multi-Support) - Piling Of 2 Bridges (1St Bore (Cfa800 Vb. Pile, 800 Mm Diameter And 9.0-16.0 M Length); 2Nd Bore (Cfa800 Vb. Pile, 800 Mm Diameter And 17.0-21.5 M Length) - Creation Of One-Sided Drainage (Open Ditch) - Replacement Of Crossing Utilities (Water: Dn355 Kpe, ~173 M Length, Rainwater: Dn250 Kpe, ~174 M Length; Medium Voltage Electricity: 22 Kv, Ground Cable, ~ 227 M Trail Length) - Street Lighting - Installation Of Camera System - Construction Of Fence - Construction Of A Ready-Made Buffer Area (Capacity 550) - Heavy-Duty, Reinforced Loading Surface - Mechanically Controlled, Variable-Height Ramp Important Performance Conditions (Land Transfer Conditions, Operating Environment, Restrictions, Weather Or Service Risks): - With Regard To Individual Contracts For Specific Works, The Expropriation Procedures Significantly Influence The Construction Of Works Of Art (No Máv Property) - Earthwork Cannot Be Carried Out Below Freezing Point. - The Ministry Of Construction And Transport Will Provide The Technical Inspection In Nature, Additional Information Is Contained In The Public Procurement Documents, The Sample Budget, And The Technical Documents. Based On § 46 (3) Of The Government Decree (Kr.) The Tenderer (Ak) States That The Reference To The Product, Origin, Type, Process, Person, Patent Or Trademark Specified In The Invitation To Tender And The Public Procurement Documents Is Only Was Made In Order To Clearly Define The Nature Of The Object, And The Term Or Equivalent Is To Be Understood. It Is The Responsibility Of The Tenderer (At) That, Based On § 46 (3) Of Government Decree - In View Of The Fact That The Exact Technical Documentation Of Certain Investments To Be Carried Out On The Basis Of The Framework Agreement Is Not Available, Therefore, In The Procedure For Concluding The Framework Agreement, It Is Not Possible To Describe The Subject Of The Contract In A Sufficiently Precise And Understandable Manner According To § 46 (2) Of Government Decree 321/2015. (X. 30.), From Which The Subject Of The Contract Justifies -
|