Construction Work – 1522-2025Kor Baumeister. Modernization Immo 2 1. Ba The Builders Work Advertised Includes All Services That Have To Be Carried Out By The Builder Trade As Part Of The Planned Facade Renovation And Energy Upgrade On The Above-Mentioned Rows Of Houses. The Builder Must Set Up The Entire Construction Site Equipment And Maintain It For The Entire Construction Period, Including The Placement Of All Necessary Containers, Provision Of Utilities And Comprehensive Tenant Support. Demolition Work Is Required On The Facades As Preparatory Measures For The Subsequent Etics Work, Such As Demolishing Shutters, Window Sills, Reveal Plastering, Creating Smooth Lines In Reveals, Etc. To Create The Base Insulation, Earthworks Including Filling And Paving Work Must Be Carried Out. In Order To Insulate The Cellar Ceilings And Walls And Renew The Cellar Compartments, The Cellars Must Be Cleared And Cleared Out; All Necessary Work Including Container Placement And Disposal Must Be Undertaken, Including The Associated Documentation And Tenant Support. The Top Floor Ceilings And The Stairwell Walls In The Attics Are Also Insulated; In Addition To The Insulation Work, The Corresponding Clearance Work In The Attics Is Required. All Doors In The Basements And Attics Will Be Upgraded For Fire Protection And Replaced. All Basement Windows Will Be Removed And Replaced. . Rough Mass Construction Work, Construction Fence, Tubular Steel Frame 800 M Measures In Basements And Compartments, Inventory, Documentation, Assistance With Evacuation, Demolition Of Compartments, Disposal, Assembly Of New Compartments, Assistance With Re-Occupancy 156 Compartments (Apt.) Storage Containers, 20-Ft Sea Containers 10 Pieces Measures In Attics, Demolition Of Wooden Compartments 770 M² Dismantling Steel Doors To The Basement And Attic 38 Pieces Dismantling Folding Shutters, Sizes Approx. 112 X 140 Cm And 112 X 205 Cm 340 Pieces Demolition Of Soffit Plaster And Edging 3500 M Demolition Of Window Panels 865 M Demolition Of Mortar Layer And Masonry Cut 865 M Excavation Of Base Zone On Street Sides (Partial) 150 M³ Refilling With Supplied Gravel 150 M³ Enlarge Individual Foundations Under Supports Balconies 64 Pieces Of Smooth Soffits, Depth Approx. 16 Cm 4380 M Insulation Of Basement Ceilings With Mineral-Based Wood Wool Insulation Panels 85 Mm 1710 M² Side Insulation On Cellar Walls, 30 And 60 Cm High 1450 M Thermal Insulation On Cellar Walls, Wood Wool Insulation Panels 155 Mm 586 M² Walkable Wood-Based Floor, Osb Boards On Insulation Layer, 220 Mm In The Attic 1960 M² Multi-Layer Insulation Board, Rock Wool, Wood Wool Top Layer On One Side, 225 Mm 450 M² Mineral Wool Insulation Wlg 032 On Stairwell Ceilings 151 M² Cellar Window, Plastic, Size Approx. 55-60 X 40-45 Cm, Double Glazed 136 Pieces Of T30 Rs Doors In Basements And Attics 76 Pieces Of Metal Cellar Compartment System 940 M² Doors In Metal Cellar Compartment System 155 Pieces Of Allowance Connection A
|