1. The Subject Of The Order Is The Establishment Of A Day Support Center For Seniors In Zalesie. The Senior Home Will Be Established In Zalesie On Plot No. 749 And Partly On Plots No. 704 And 558/2. The Unit Is Not Currently Operational - It Will Be Created As Part Of The Project. Construction Works Will Consist In The Expansion And Reconstruction Of The Existing Building Along With A Change In Its Use. The Expansion And Reconstruction Of The Sports Facilities With A Change Of Use For The Senior Support Center In Zalesie Are Planned, Including, Among Others: Reconstruction Of Rooms, Finishing Works, Door And Window Joinery, Insulation And Façade Of Walls, Sanitary Installations, Electrical And Telecommunications Installations And Land Development (Hardening The Area - Sidewalks, Access Road, Parking Lots), Construction Of A Rainwater Tank And Construction Of A Rainwater Drainage System, Water Supply Connection, Photovoltaic Installation, Energy Storage, Lan Installation, Antenna, Radio Transmission System, Cctv Monitoring, Digital System Signage, Call System, External Works, Gas Installation. Planned Heating And Cooling Installations: Central Heating Installation And Mechanical Ventilation And Air Conditioning.2. Information On Compliance With The Principle Of Do No Significant Harm To The Environment (Dnsh)1) The Contractor Will Be Obliged To Comply With The Principle Of Dnsh Throughout The Entire Period Of Contract Implementation.2) The Principle Of Dnsh (Do No Significant Harm) Is The Principle Of Not Supporting Or Conducting A Business Activity That Causes Significant Damage (Serious Damage, Has A Significant Negative Impact) For Any Of The Environmental Objectives, Such As: A) Climate Change Mitigation, 2) Adaptation To Climate Change, 3) Sustainable Use And Protection Of Water And Marine Resources, 4) Circular Economy, 5) Pollution Prevention And Control, 6) Protection And Restoration Of Biodiversity And Ecosystems Construction Works Should Be Carried Out In Accordance With The Dnsh Principle (Do No Serious Harm), Which Is A Requirement Resulting From: Regulation (Eu) 2021/241 Of The European Parliament And Of The Council Of 12 February 2021 Establishing The Recovery And Resilience Facility. Https://Eur-Lex.Europa.Eu/Legal-Content/Pl/Txt/?Uri=Celex%3A32021r0241 B) Regulation (Eu) 2020/852 Of The European Parliament And Of The Council Of 18 June 2020 On Establishing A Framework To Facilitate Sustainable Investment, Amending Regulation (Eu) 2019/2088 Https://Eur-Lex.Europa.Eu/Legal-Content/Pl/Txt/?Uri=Celex%3A32020r0852 To Confirm Compliance With The Above Rule, The Contractor Will Be Obliged, For Example, To: • Comply With Applicable Environmental Protection Regulations At The Construction Stage, • Present Epd Material Cards, Declaration Certificates Confirming The Origin, Quality And Safety Of The Materials And Devices Used, Etc. • Segregate Waste During Construction, • Tidy Up The Construction Site After Completion Of The Works, • Remove A
|