Tender For Construction/extension/shifting of 33 kV, 11 kV and LT lines under the full deposit scheme in the Electricity Distribution Division, Saifai, on a semi-turnkey basis.- 1 Carriage of following Centralized Materials from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 2 STP Pole 11 Mtr. 3 PCC Pole 8.5 Mtr. 4 33 Kv 3x300 Sqmm XLPE Alluminium Cable 5 ACSR Weasel Conductor 6 AB LT Cable (3*120+1*95+1*16) Sqmm 7 25 KVA T/F 8 100 KVA T/F 9 Earthing Complete 10 Stay Complete 11 33 Kv 3x300 Sqmm XLPE Cable Box O/D 12 Erection & fabrication of following supports including fitting of all required accessories required for proper completion of work as per RESSPO Schedule. It including the cost of all labour, T&P etc. 13 Erection of Single support by ST/PCC pole including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work. 14 Grouting of Single support ST/PCC pole as per RESSPO Manual including of the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast. including the cost of arrangement of cement, sand, brick ballast etc. 15 Erection & Grouting of Double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast. including the cost of arrangement of cement, sand, brick ballast etc. 16 Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. 17 Laying, sagging, stringing, binding & jumpering of LT ABC Cable on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. 18 Erection and grouting of stay set including the work of nozzling etc. as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. 19 Fixing & connecting of Earthing Rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work. 20 Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 21 Mounting of 100 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 22 Digging, laying and back filling of 33 Kv 3x300 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE/GI pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work. 23 Filling Of 33 Kv 3x300 Sqmm Heat Shrinkable Cable Jointing Kit (Outdoor Type). (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work) 24 Chemical Pipe Earthing Body & Neutral Of Transformer and connections as per Norms. 25 Carrage & Fixing of 33 Kv Disc Fitting (T&C) 30 KN 26 Carrage & Fixing of 11 Kv Disc Insulator 27 Carrage & Fixing of Disc Fitting 45 KN (T&C) 28 Carrage & Fixing of 11 Kv Pin Insulator with pin 29 Carrage & Fixing of 11 Kv Fuse Set 30 Carrage & Fixing of Three Phase SMC Distribution Box 31 Carrage & Fixing of DP Clamp for PCC Pole 32 Carrage & Fixing of 11 Kv V-Type Cross Arm 33 Carrage & Fixing of F-Clamp for STP 34 Carrage & Fixing of Holding Clamp for PCC Pole 35 Carrage & Fixing of Cross Arm Holding Clamp for STP 36 Carrage & Fixing of GI Wire 4 mm/ 8 Swg 37 Carrage & Fixing of Stay Wire GI 7/10 Swg 38 Supply, Installation & Fixing of following De-Centralized Materials/accessories. including the cost of labour, T&P and carrier etc. required for proper completion of work. 39 33 Kv MS Top Channel 100x50x5x2240 mm 40 33 Kv MS T-Off Channel 100x50x5x1300 mm 41 33 Kv MS Dropper Channel 100x50x5x2028 mm 42 11 Kv MS Top Channel 100x50x5x2240 mm 43 11 Kv MS T-Off Channel 100x50x5x1300 mm 44 11 Kv MS Dropper Angle 45 Nut & Bolt 46 GI Pipe 6" Dia 47 HDPE Pipe 6" Dia 48 T/F Base Angle 65x65x6x2028 mm 49 Stay Insulator 50 LT Clamp for PCC Pole 51 Dead & Clamp 52 I-Hook with Clamp 53 Suspension Clmap Please Enable Macros to View BoQ information
|