|
4.2. As Part Of The Construction Works, The Contractor Will Perform In Particular: 1. Demolition/Disassembly Works: • Former Scout Hut Building: Disassembly Of Joinery, Demolition Of Walls, External Stairs, Floors/Floors; Construction Of An Exit In The Northern Wall With Lintel Protection; Dismantling The Asbestos Covering And Its Disposal In Accordance With Applicable Regulations, • Building At Ul. Podrzeczna: Demolition Of The Indicated Elements (Brick Wall, Wooden Annex, Wooden Roof), Dismantling Of Flooring Layers; Making An Opening In The Southern Wall With Lintel Protection.2. Construction And Construction Works - Connector: Excavations, Foundations/Strings, Foundation Walls And Ground Floors, Insulation, Reinforced Concrete Ceiling, Tie Beams, Anchors For Wall Panels, Wooden Roof Structure - In Accordance With The Design.3. Finishing Works And Roofs: Membranes, Battens/Counter-Battens, Coverings, Sheet Metal Flashings, Gutters, Plasterboard Walls, Plasters, Ventilation Chimneys With Ends And Grilles, Cladding In Sanitary Facilities, Floors By Layers, Window/Door Joinery And Internal Painting - In Accordance With The Design.4. External Works: Insulation (Walls, Ceiling), Facade Layers, Plinths, Facade Painting, Entrance Stairs, Balustrades And Equipping A Platform For People With Disabilities - In Accordance With The Design.5. Water Supply And Hot Water Installation: Distribution In Floor Layers/Furrows, Passages In Sleeves, Shut-Off Fittings, Cable Insulation; Domestic Hot Water From An Electric Heater; Required Pressure Testing And Rinsing And Protocols.6. Fire Protection Installation Passages: At Passages Through Fire Protection Partitions. Use Fire-Resistant Solutions/Materials Such As A Partition.7. Sanitary Sewage: Pvc Pipes, Inspections, Exhaust Vents Above The Roof, Routing And Fastening Of Pipes, Making Passages In Sleeves, Tightness Tests And Protocols.8. Bathroom Equipment For People With Disabilities: Utensils And Handrails/Handles And Installation Heights In Accordance With The Design.9. Heating: Electric Heating With Radiators According To The Design,10. Dismantling The Existing Electrical Installation,11. Installation Of A Fire Protection Switch, 12. Construction Of The Power Line And Installation Of The Main Board,13. Installation Of Plug Sockets And Lighting, Installation Of Accessories And Fixtures, 14. Performing Tests And Measurements Of The Electrical Installation And Submitting Reports.
|