|
1. The Subject Of The Order Is The Thermal Modernization Of The Building Of The School Complex No. 1 In Dzierżoniów, At Ul. Mickiewicza 8, As Part Of The Partnership Project No. Feds.02.01-Iz.00-0016/25 Entitled Improving The Energy Efficiency Of Public Buildings In The Dzierżoniów Agglomeration. 2. The Task Is Co-Financed Under The European Funds For Lower Silesia 2021-2027 Program, Recruitment Number: Feds.02.01-Iz.00-200/25 - Measure 2.1 Energy Efficiency In Public Buildings, Type 2.1 A - Comprehensive Energy Modernization Of Public Buildings. 3. Building Of The School Complex No. 1 In Dzierżoniów, At Ul. Mickiewicza 8 Is Listed In The Register Of Monuments. 4. For The Construction Project In Question, The Ordering Party Has The Building Permit Decision No. 109/2022 Of March 1, 2022, Some Of The Works In The Scope Of The Above-Mentioned. Permits Were Executed In 2024 (Reconstruction Of The Boiler Room). 5. Subject Of The Order Entitled Thermal Modernization Of The Building Of The School Complex No. 1 In Dzierżoniów, At Ul. Mickiewicza 8 Includes: 1) Renovation Of The Facade - Footings And Foundation Walls Below Ground Level (Drying, Mineral Waterproofing From The Outside, And Renovation Plastering From The Inside; Above The Footings, Horizontal Insulation Of Basement Walls In The Form Of Low-Pressure Injection With A Resin-Silicone Preparation); - External Plastering Of The Basement Floor, Waterproofing Of The Wall In The Ground (Preparatory And Demolition Works, Assessment And Preparation Of The Substrate, Plastering, Insulation And Supplementary Works); - External Plasters, Waterproofing Of Walls In The Ground, Building Plinth (Assessment And Preparation Of The Substrate, Plastering, Insulation And Stonework Works - Plinth Made Of 3 Cm Granite Slabs); - South-East, North-West And South-West Elevations Above The Plinth And Above The Ground Floor (Assessment And Preparation Of The Ground, Stucco Works, Plastering And Painting Works, Sheet Metal Works, Carpentry Works (Door Renovation) And Others, E.G. Dismantling Of Inactive Tv Antennas, Masts, Cameras, Brackets, Etc. According To The Design) - North-East Elevation – Insulation With Polystyrene With A Coefficient Of 0.032 W/Mk. Insulation Thickness 15 Cm. Thin-Layer Plaster Applied Systemically (Drawing No. 3 In The Project). Due To The Historic Nature Of The Facility, During The Works, A Conservation Commission Should Be Held With The Participation Of The Construction Manager And The Conservator Of Monuments, In Order To Present A Test Of New Plaster Coats, A Test Of Conservation And Reconstruction Of Details, And A Test Of Painting (The Conservator Should Be Notified Of The Date Of The Meeting 14 Days Before The Planned Date). 2) Building Drainage - Drainage Installation With Inspection Wells; - Discharging Water From The Buildings Drainage To The Stormwater Drainage System Wells Indicated In The Drawing Part Of The Technical Documentation; - Restoration Of Damaged Surfaces At The Place Of W
|