|
1. The Scope Of Construction Works Includes The Reconstruction Of Part Of The Building Of The City And Commune Office In Połaniec - Adaptation And Finishing Works Related To Adapting The Rooms In The Building To The Cus Function. 2. The Order Must Be Made In Accordance With: 2.1. The Attached Design Documentation - Constituting The Basis For Estimating And Carrying Out The Works, 2.2. The Attached Bill Of Quantities - Constituting Only A Supplement To The Above-Mentioned Documentation, 2.3. Technical Specification For The Execution And Acceptance Of Construction Works Stwiorb.3. The Scope Of The Order Concerns The Part Of The Office Building Between The Main Building And The Ckisz Building In Połaniec, I.E.: A) Demolition Works, Including: Demolition Of The Sheet Metal Roofing And The Structure - One Side Of The Roof, Lightning Protection System, Gutters And Sheet Metal Work In The Area Of The Dismantled Slope, Parts Of Window Joinery, Internal Door Joinery, Parts Of Internal Walls With Forgings And Holes, Parts Of The Ceiling, Parts Of The Installation Central Heating, Mechanical Ventilation Ducts, An Inactive Hydrant Box With Piping And Parts Of The Electrical Installation. B) Construction And Installation Works: The Scope Of Works Includes Completely Finished Rooms, Ready For Use, I.E., Among Others: Construction Of Walls Using Dry Technology - Plasterboard Partitions, Laying Tiles On The Floor And Wall, Laying Vinyl Flooring, Painting Ceiling Walls, Installation Of Fire-Resistant Windows And Internal Doors In Accordance With The Projection And Joinery List, Installation Of Water And Sewage, Central Heating, Fire Hydrant, Electrical, Low Current, Mechanical Ventilation, Thermal Insulation And Waterproofing, Insulation Of External Walls And Façade Plastering Of External Walls, Shifting - Adaptation Of Existing Lighting Lamps, Ventilation Ducts And Radiators To Newly Constructed Rooms, Installation Of A Lightning Protection System And Other Finishing Works. C) After Completing The Work, The Contractor Will Provide All Necessary Measurements, Tests, Certificates And As-Built Documentation. Materials And Built-In Devices Must Be New And Unused And Not Older Than 6 Months Before Their Installation (Windows, Doors, Sheet Metal, Lighting Fixtures, Installation Equipment, Air Conditioners, Heater, Radiators, Fire Protection). D) Part Of The Building Where Construction Works Will Be Performed With Partial Acceptance For Use (The Scope Of The Building Permit Also Includes The Expansion Of The Building With An External Elevator In The Main Part Of The Building And The Replacement Of All Internal Doors In The Main Building, Which Is Not Included In The Scope Of This Order).4. The Ordering Party Allows Including In The Offer And Then Using Materials And Equipment Other Than Those Specified In The Description Of The Subject Of The Order, Provided That Parameters Are Not Worse Than Those Specified In This Order. In Such A Situation, The Ordering Party Requir
|