• The Supply Of F2 Power Cables (See Descriptive Quantity Survey); • Laying Cables In The Pipes Between The Old Mv Station And The New Mv Station; • The Supply Of All The Equipment Necessary For The Work; • The Delivery Of Aa20 Medium Voltage Equipment, The Tgbt, The Earth Boxes, The Various Panels As Well As The 250 Kva Transformer, From Our Cli In Luttre To The New Mv Substation At Louvière-Industrielle; • The Assembly As Well As The Connection, In The Panels, Boxes, Between Aa20 Equipment And The Transformer, Of All Equipment Supplied By Infrabel And By The Successful Bidder According To The Plans Submitted; • Commissioning Of The New Mv Substation; • Transfer Of Power Supplies From The Old Pmt To The New Pmt; • The Reeving Of The Old Cables Coming From The Old Tgbt And The New Cables Going To The New Tgbt; • Dismantling, With Recovery, Of The Medium Voltage Substation Of The Old Mv Gli Substation (Wired Substation) As Well As All The Connection Elements (Cables And Copper Bar) According To The Plans Submitted; • Dismantling, With Recovery, Of The Earth Boxes (Former Pmt) And All Connection Elements; • Dismantling, With Recovery, Of The Low Voltage Switchboard (Tgbt) According To The Submitted Plan.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108350419
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.