Building Construction Work – Landquart Expansion Workshop For Thermal Vehicles And Interior Switchgear, Bkp 250 Sanitary. In The Workshop For Thermal Vehicles, Four Tracks With Pits Are Being Expanded To A Usable Length Of 20 M By Means Of A Hall Extension And Extension. Replacement Areas Will Also Be Created For Material Storage And Office Space. In The Track Field In Front Of The Workshop Halls, The D Group Tracks Will Be Renewed And Their Position Will Be Adapted To The Geometries Of The New Hall Entrances. The Indoor Switchgear Will Be Housed In The Newly Constructed Basement. The Basement Is Constructed Using Solid Construction And Measures Approximately 27.2 By 24.8 Meters. In The Extension To The Existing Hall, A New Hall Measuring Around 28.4 By 14.4 Meters Will Be Built In Steel Construction, Which Will Have A Mezzanine Floor Under Terrain In Solid Construction. The Workshop Extension (17.7 By 13.4 Meters) Has A Partial Basement. A Two-Story Intermediate Building (15.7 By 8.2 Meters) Will Also Be Built In Solid Construction, Which Will Also Have A Partial Basement. The Excavation Pit Is Secured Using Rock Walls, Which Are Partially Blown Off. The Addition And Expansion Takes Place Parallel To Workshop Operations And The Usability Of Two Tracks In The Workshop Must Be Guaranteed Throughout The Entire Construction Period. Brief Description Of Sanitary Facilities A New Distribution Battery Is Being Built On The 2Nd Basement Floor, Which Will Supply The New Building. The Existing Distribution Battery Will Be Moved To A New Location And Completely Rebuilt. In Addition, A Softening System Will Be Installed, Which Will, Among Other Things, Supply The New High-Pressure Cleaners. The Halls Are Equipped With The Following Media According To The Users Requirements: Cold Water (Mains Pressure), Cold Water (Reduced Pressure), High Pressure, Compressed Air And Hot Water. The Existing Working Pits Will Also Be Made Accessible With The Appropriate Media. Roof Drainage Is Carried Out Partly Via A Negative Pressure System And Partly Via Conventional Drainage. Both Systems Are Connected To The Newly Created Underground Lines. Since The Basement Is Located Below The Backwater Level, A Wastewater Lifting System Is Used In Both New And Old Buildings.
Contact Information
Address
Bahnhofstrasse 25
Contact No.
+41812882690
Email
renato.florineth@rhb.ch
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108116614
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.