|
1. Subject Of The Orderthe Subject Of The Order Is The Construction Of A School Playground At The Primary School No. 9. Jana Pawła Ii In Ełk At Ul. Piwnika Ponurego 1 In Ełk. Construction Works Will Be Carried Out On An Active School Facility. The Investment Area Is Not Under Conservation Protection.1.1. The Scope Of The Order Includes: A) Securing The Construction Site, B) Execution Of Earthworks And Demolition Works, Including Removal, C) Delivery And Installation Of: • A Playground Equipment Containing, Among Others: 2 Roofed Towers; 3 Towers Not Roofed; Steel Slide – 2 Pcs; Steel Entrance Ladder; Climbing Wall With Stones; Firemans Pipe; Bridge Crossing; Tunnel Passage; Rope Crossing With Slabs; Wheel Of Fortune; Maze Circle; Manipulation; Drawing Board.• Fitness Set: 4 Unroofed Towers; Rope Crossing; Point Crossing, Plank Crossing, • Multifunctional Set: Climbing Hexagon; Rope Ladder; Climbing Bars And Plates, Interlace On The Top;• Double Swing And Storks Nest: Board-Type Seat - 2 Pcs, Storks Nest-Type Seat - 1 Pc. • Board With Playground Regulations - 1 Piece, • Park Benches - 3 Pieces, • Garbage Bins - 3 Pieces, D) Construction Of Aggregate Base For A Safe Surface, E) Construction Of A Safe Two-Layer Polyurethane Surface With A Thickness Of Min. 60 Mm (Hic Fall Height Of At Least 1.7 M) Upper Layer Made Of Epdm, 10 Mm Thick, Lower Layer Made Of Sbr, 50 Mm Thick, Surrounded By Concrete Edges With An Area Of 252.0 M2, F) Construction Of A Panel Fence, 150 Cm High, With A Concrete Foundation, 85.5 M Long, Including 2 Gates, 1.2 M Wide, G) Construction Of Pedestrian Walkways With A Surface Of Concrete Cubes On An Aggregate Base Surrounded By Concrete Edges With An Area Of 40.5 M2, H) Construction Of Area Lighting: Park Lamp With Led Fitting - 2 Pcs, I) Construction Of Video Monitoring - Camera On A Pole - 1 Pc, J) Greenery Development, Including: Establishment Of Lawns And Flower Beds Mulched With Bark, Plantings) Restoration Of Damaged Or Devastated Surfaces To Their Original Condition Paved And Green Areas After Construction Works, L) Cleaning The Area After Construction Works, M) Certification Of The Playground By External Entities For Compliance With The Pn-En 1177+A1:2024-05 And Pn-En 1176-1+A1:2024-03 Standards, N) Preparation Of As-Built Documentation In Two Copies, Including, Among Others: • Geodetic Documentation As-Built,• Statements Of The Construction Manager,• Reports Of Tests And Measurements Carried Out During The Work,• Approvals And Certificates Of Built-In Materials,• Playground Certification Report (Equipment And Surface)• Other Documents Necessary To Obtain An Occupancy Permit.1.2. As Part Of The Offered Price, The Contractor Will Be Obliged To: A) Purchase Utilities (I.E. Electricity, Water) For The Duration Of The Construction Works, B) Obtain A Current Geodetic Map Showing The Actual Condition Of The Areas Infrastructure Due To Possible Built-In Underground Facilities Not Shown On The Attached Maps, C) Maintain And Prot
|