This Work Includes The Supply Of All Labour, Materials, Equipment And Services Required To Complete The Construction Of Reclamation Work For The Site Restoration Of The Cut-Off Wall At The Landfill’S Area 1 Of Edmonton Waste Management Centre (Ewmc).The Work Includes, But Is Not Limited To The Following: 1. Mobilization And Demobilization 2. Work Site Management Including Temporary Construction Facilities, Security, And Protection Of Existing Utilities 3. Site Grading To Reestablish Soil Cover And Liner, Including The Clay Cap, Subsoil, Topsoil And Seed, As Well As Sheet Flow Drainage Across The Landfill Closeout 4. Incorporate Recently Constructed Working Pad Into The Backfill As Part Of The Grading 5. Remove And Repurpose Of Frost Cap, Diversion Berms, Containment Berms 6. Rescue Identified Onsite Stockpile Materials And Clean Slurry/Mixing Ponds 7. Construct A New All-Weather Access Road Around The Perimeter Of The Site 8. Hydroseed Throughout The Site Including Along The Riverbank 9. Restore All Monitoring Wells Decommissioned During Slurry Wall Construction 10. Install Groundwater Monitoring Wells To Verify The Intent And Performance Of The Slurry Cut-Off Wall
Contact Information
Address
9803-102A AvenueEdmonton, AlbertaT5J 3A3Canada
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108058104
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.