|
Switch 24 Ports Rj-45 10/100 + 2 10/100/1000, Including Mounting On Rack 19, Supply Of Evaporator Unit For Vrf, Hiwall 7,000 Btu/H, Model Crnu07gsjn4, Reference Brand Lg Or Equivalent. With Installation., Hiwall 12,000 Btu/H, Model Crnu12gsjn4, Hiwall 15,000 Btu/H, Model Crnu15gsjn4, Hiwall 18,000 Btu/H, Model Crnu18gskn4, 01/27/2026 - 11:17:40, 01/27/2026 - 11:17:43, 01/27/2026 - 11:17:44, 01/27/2026 - 11:17:46, 01/27/2026 - 11:17:47, Hiwall 24,000 Btu/H, Model Crnu24gskn4, Hiwall 30,000 Btu/H, Model Crnu30gsva4, 4-Way Cassette 7,000 Btu/H, Model Crnu07gtrb4, 4-Way Cassette 18,000 Btu/H, Model Crnu18gtqb4, 4-Way Cassette 24,000 Btu/H, Model Crnu24gtbb4, 4-Way Cassette 30,000 Btu/H, Model Crnu30gtbb4, 4-Way Cassette 36,000 Btu/H, Model Crnu36gtbb4, Supply Of Condenser Units, Type Vrf, Formed By Modules Totaling 112 Hp, Reference Brands Midea, Lg Or Equivalent. With Installation., Supply Of Vrf Touch System Controller, Model Pacs5a000, Supply Of Hi-Wall Inverter Split Type Air Conditioning Evaporator Unit (Wall) 9,000 Btus 220V - Cold Cycle - Classification A (Procel Seal). With Installation., Supply Of Hi-Wall Inverter Split Type Air Conditioning Condensing Unit (Wall) 9,000 Btus 220V - Cold Cycle - Classification A (Procel Seal). With Installation, Air Curtain Supply, 90Cm, White With Control, 220V, Model Ht9- 3009F/Y, Hulter Reference Brand Or Equivalent. With Installation, Local Administration, Executive Project, Demolitions And Removals, Inc Loading, Transport And Unloading In Licensed Area, Land Cleaning, Demolition And Fragmentation Of Rock Blocks, Mechanized Earth Movement For Land Regularization, Including Cargo, Work Location, Signs, Sidings And Sheds, Temporary Installations Water, Sewage And Energy, Scaffolding, Execution 28 Piles Including Tests And Load Tests - A, Execution 28 Piles Including Tests And Load Tests - B, Execution 27 Piles Including Tests And Load Tests - C, Execution 27 Piles Including Tests And Load Tests - D, Execution 27 Piles Including Tests And Load Tests - E, Blocks/Pillarets (30 Units): Including Excavation, Drainage, Concrete, Formwork, Steel And Backfill - A, Steel And Backfill - B, Belts (16 Units): Including Excavation, Belts (15 Units): Including Excavation, Steel And Backfill - C, Adjacent Buildings: Garbage House, Pumps, Insecticide, Guardhouse, Substation, Reservoir E Others - Infrastructure, 1St Floor Slabs (11 Units): Including Excavation, Waterproofing Of Foundations And Attached Buildings, Pillars (30 Units) - Including, Form And Steel - A, Form And Steel - B, 2Nd Floor Beams (19 Units) - Including, 2Nd Floor Beams (18 Units) - Including, 2Nd Floor Slabs (14 Units) - Including, Covering Pillars (27 Units) - Including, Covering Beams (17 Units) - Including, Covering Slabs (13 Units) - Including, Covering Slabs (12 Units) - Including, Beams, Pillars, Barrel Slab/Reservoirs, Roof Platband - Including, Formwork And Steel, Reservoir And Others - Suprastructure, Masonry And Other Systems Gap Closures - 31 Rooms On The 1St Floor, Masonry And Other Gap Closing Systems - 27 Rooms On The 1St Floor, Masonry And Other Gap Closing Systems - 21 Rooms On The 2Nd Floor - A, Masonry And Other Gap Closing Systems - 21 Rooms On The 2Nd Floor - B, Masonry And Other Gap Closing Systems Gap Closures - Roof Platbands, Floor Slabs
|