|
The Scope Of Work Includes: 1.1. Scope Of Work - Construction Works - Dismantling Door Frames, - Dismantling Floor Coverings, - Removing Tiles From Walls And Floors, - Sanding Floors, Replenishing Plasters On Walls, - Making A Self-Leveling Base, - Making Insulation With Liquid Foil And Sealing Tapes In Bathrooms, - Laying Floor Coverings In Tiles Together With Plinths, - Laying Ceramic Tiles On Walls And Floors In Bathrooms And On Corridors, - Installation Of New Doors With An Adjustable Door Frame + Aluminum Thresholds, - Priming And Painting Walls And Ceilings, - Installation Of Plastic Ventilation Grilles, Revision.1.2. Scope Of Work - Electrical Works - Construction Of Under-Plaster Electrical Installation, - Construction Of Structural Lan Network Installation, - Replacement Of Existing 230V And Tv Sockets, - Replacement Of Ceiling Lighting Fixtures With Led Ones, - Installation Of Motion Detectors In The Corridors.1.3. Scope Of Work - Sanitary Works - Disassembly Of Washbasins, Toilets, Shower Trays With Cabins, Faucets, Radiators, Etc., - Assembly Works; Pipelines, Drain Connections, Etc., - White Assembly: Frames, Toilet Bowls, Shower Trays, Shower Cabins, Washbasins, Faucets, Radiators, Etc. - Installation Of New Exhaust Fans. A Detailed Description Of The Subject Of The Order Is Attached As Annex No. 2 To The Swz, Which Includes: 1. Bills Of Quantities, 2. Stwior - Construction (Prz) 3 Industries,3. Location Of The Facility. Accessibility Requirements For People With Special Needs, Which The Contractor Is Obliged To Provide While Implementing The Subject Of The Order (Indicate Specific Elements): Ensuring Accessibility By Removing Barriers In The Form Of Thresholds In The Entrance Doors, Replacing High-Profile Shower Trays With Low-Profile Shower Trays. Attention!!! Difficult Access To The Facility In Winter And Spring - Deliveries Of Materials Only By Delivery Vehicles.
|