The Task Includes The Construction Of A Sanitary Sewage System With The Necessary Technical Infrastructure In The Towns Of Fałków And Studzieniec And Its Integration Into The Existing Sewage Network In The Town Of Fałków. The Task Includes The Construction Of A Gravity Sanitary Sewage Network With A Diameter Of Ø200 Mm And A Total Length Of 1,403.0 M, A Gravity Sanitary Sewage Network With A Diameter Of Ø160 Mm, And A Total Length Of 388.0 M, A Pressure Sanitary Sewage Network From A Network Sewage Pumping Station With A Total Length Of - 2,048.5 M, A Pressure Sanitary Sewage Network From Home Sewage Pumping Stations With A Total Length Of - 622.0 M, Construction Network Sewage Pumping Stations With Accompanying Infrastructure - 1 Pc, Construction Of Home Sewage Pumping Stations With Accompanying Infrastructure - 7 Pcs, And Involves The Construction Of Internal Lines Supplying Network Sewage Pumping Stations With An Xkxs 4X25mm2 Cable - 1 Pc. As Part Of The Task, The Contractor Is Also Obliged To Obtain A Permit To Use The Constructed Sanitary Sewage System In Accordance With The Provisions Of The Construction Law. A Detailed Description Of The Scope Of Work Is Specified In The Technical Documentation Constituting Annex No. 2 To The Swz. The Settlement Of The Task Is A Lump Sum, And The Bill Of Quantities Included In The Documentation Serves An Auxiliary Function. The Offer Cost Estimate, Prepared On The Basis Of Bills Of Quantities, Should Be Provided To The Ordering Party Before Signing The Contract. Requirements Related To The Implementation Of The Order In Terms Of Employment By The Contractor Or Subcontractor On The Basis Of An Employment Relationship Of Persons Performing The Activities Indicated By The Ordering Party In The Scope Of Contract Execution, If The Performance Of These Activities Involves The Performance Of Work In The Manner Specified In Art. 22 § 1 Of The Act Of 26 June 1974. – Labor Code (Journal Of Laws Of 2022, Item 1510, As Amended) Covers The Following Types Of Activities: - General Construction Works Wherever The Subject Of The Contract Is Described By Indicating Trademarks, Patents Or Origin, The Ordering Party Allows The Contractor To Use Solutions Equivalent To Those Described In The Technical Specification For The Execution And Acceptance Of Works Or In The Design Documentation, Provided That They Have At Least The Same Or Better Technical Parameters And Functional And Will Not Lower The Standards Specified In The Documentation. Required Warranty Period: - At Least 3 Years (The Warranty Period Is An Additional Criterion For The Evaluation Of Offers) Task Co-Financed By The National Reconstruction And Resilience Plan (Kpo) In The Field Of Investments In Sustainable Water And Sewage Management In Rural Areas (B3.1.1)
Contact Information
Address
Gmina Fałków,Fałków,26-260,Świętokrzyskie,Pl721 - Kielecki
Email
przetargi@falkow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107937379
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.