Part No. 1 - Generator With Automatic Switching System For The Ug Headquarters Total1) Power According To Pn-Iso 8528 Or Equivalent:A) Rated Power Min. Prp 80Kva/64Kw B) Maximum Power Min. Esp 88Kva/70Kw 2) Nominal Voltage 400V 3) Regulation Class (Iso 8528-5 Or Equivalent) G24) Enclosed And Soundproofed Unit With A Noise Level Of No More Than 70Db From 7 Meters. 5) Housing Made Of Corrosion-Resistant Materials Or Metal Protected Against Corrosion 6) Maximum Housing Dimensions 2700X1200x1700 (Lxwxh)7) Service Doors On Both Sides Of The Housing + 1 From The Control Panel 8) Access To The Radiator Using A Removable Panel 9) Fuel Tank For A Minimum Of 24 Hours Of Operation 10) Locks And Housing Fittings Made Of Corrosion-Resistant Materials Corrosion And Metal Locks/Fittings. 11) Fuel Level Indicator 12) Fuel Filler Secured With A Key 13) Unit Equipped With A Heating System Enabling The Unit To Start At Low Temperatures 14) Vibration Dampers Between The Frame And The Engine Unit And Generator 15) Exhaust Silencer 16) Unit Manufactured No Earlier Than 12 Months Before Delivery 17) Warranty Min. 60 Months18) Engine Fuel Consumption Not Exceeding 20L/H At 100% Prp Load 19) Inspections Recommended By The Engine Manufacturer No More Frequently Than Every 500Mth 20) Generator Structure: Synchronous, Self-Excited, Self-Regulating, Brushless, Single-Bearing21) Generator Efficiency 100% At Prp Min. 88.5% 22) Automation Panel Equipped With Microprocessor Controller With A Digital Lcd Display 23) Controller Menu In Polish 24) Generator Equipped With A 3-Pole Switch 26) Plastic Tank Or Steel Frame Tank 27) The Generator Must Be Equipped With A Starter Enabling Automatic And Manual Start. Automatic Start-Up Must Be Carried Out In The Event Of A Main Power Failure.28) Adaptation Of The Generating Set To The Existing Emergency Power Supply Of The Ordering Party. 29) Carrying Out Warranty Inspections According To The Manufacturers Recommendations During The Warranty Period (5 Years) - At Least Once A Year. Reserve Connection System. All Related Costs, E.G. Modernization Of The Existing Electrical Installation, Must Be Anticipated And Included In The Contractors Offer. The Contractor Is Also Obliged To Obtain All Consents, Permits, Technical Approvals, And Approval Of The Device For Operation, If Such Is Required By The Relevant Legal Provisions (Documentation Before Submitting To The Relevant Authorities For Approval By The Ordering Party).31) Mandatory On-Site Visit To Determine The Conditions For The Location And Installation Of The Device.
Contact Information
Address
Gmina Łączna,Łączna,26-140,Świętokrzyskie,Pl721 - Kielecki
Email
przetargi@laczna.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107937275
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.