Modernization Of The Water And Sewage Network In The Piątnica Commune. The Subject Of The Order Is The Construction Of A Pressure Sanitary Sewage System In The Towns Of Niewodowo, Rakowo-Czachy, Rakowo-Boginie - Stage Ii, Which Includes The Construction Of A Sewage System In Rakowo-Czachy. Pressure Channel Made Of Pe 100 Sdr 17 ɸ 125X7.4 Mm Pipes, 1645.4 M Long And Pe ɸ 40X3.7 Mm Pipes, 746.5 M Long, Together With Home Sewage Pumping Stations Constituting An Element Of The Pressure Network. The Pumping Stations Were Designed As Single-Pump, With A Tank Made Of Hdpe Dn 800 Mm With An Adjustable Telescopic Cover And A Control System, And A Two-Pump Zone Pumping Station With A Pump Power Of 11.5 Kw. The Scope Of The Study Includes The Construction Of A Pressure Sewage Network With Sewage Pumping Stations And A Zone Pumping Station. The Sanitary Sewage Network Will Be Located In The District Road, Municipal Roads, And On Plots. Municipal And Private Properties. The Investment Area Will Include Plots No. 254, 253, 252/1, 256, 250, 249, 248, 247, 245, 236/2, 243, 164, 163, 327, 161, 158, 157/4, 157/2, 153, 154, 152, 145/10, 145/14, 150, 340/1, 340/2, 147, 146/1, 117/9, 116/7, 116/8, 115/1, 115/2, 325, 323, 322, 321/2, 321/1, 320, 319/1, 318, 299, 252/2, 298, 297, 296, 295/2, 286/2, 284, 275, 274, 272, 269, 267, 341, 343/2, 286/5 In Rakowo-Czachy Commune. Piątnica. The Implementation Of The Planned Investment Will Not Affect Neighboring Plots. Note: The Detailed Material Scope Is Specified In The Complete Design Documentation Attached To This Specification Of Terms Of Procurement (Swz). The Bill Of Quantities Attached By The Ordering Party Is Only Of Auxiliary Nature And Is Not A Basic Document For Determining The Offer Price. Failure To Include Any Item In The Valuation Will Not Entitle The Contractor To Claim Payment For Its Performance. The Contractor Should Analyze All The Provisions Contained In The Documentation And Prepare A Price Offer Based On His Own Analysis. The Attached Bill Of Quantities Does Not Constitute The Basis For Subsequent Settlement Of The Contract - The Contract Is A Lump Sum, I.E. Its Price Is Not Subject To Change During Implementation. Cpv Code: 45231300-8 Construction Works In The Field Of Construction Of Waterworks And Sewage Disposal Pipelines45110000-1 Works In The Field Of Demolition And Demolition Of Buildings; Earthworks45111000-8 Demolition Works, Earthworks
|