1. The Subject Of The Order Is The Development Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And Obtaining, On Behalf Of The Ordering Party, The Decisions, Opinions And Arrangements Required By Law, In Particular:• Decision On Environmental Conditions• Water Law Decision (Within The Meaning Of The Water Law Act)• Decision On The Permit For The Implementation Of A Road Investment For The Investment Entitled: Expansion Of The District Road No. 1310W Wola Rębkowska - Krystyna - Stara Huta - Pod Kościeliskami In The Town Of Krystyna An Indicative Plan Showing The Location Of The Investment Task Is Attached As Annex No. 1. Design Works Should Be Carried Out On The Section From Plot No. 5/1 Rev. Wola Rębkowska To Plot No. 739 Rev. Krystyna In The Garwolin Commune - Approximate Length Of The Section: Approx. 1,750 M. Road Plots Constituting The Section Of The District Road In Question: - Plot No. 1350/2, District No. 0025 Wola Rębkowska, Unit Registration Office Garwolin, - Plot No. 92, Precinct No. 0009 Miętne, Unit Registration Office Garwolin, - Plot No. 2257, Precinct No. 0007 Krystyna, Unit Registration Office Garwolin, - Plot No. 225, Precinct No. 0007 Krystyna, Unit Cadastral Road Garwolin, It Is Required To Prepare Documentation Both To Obtain A Permit To Perform Works From The Architectural And Construction Administration Body, As Well As To Conduct A Public Procurement Procedure For Construction Works. Technical Class Of The Road: Z Traffic Category: Kr-3 As Part Of The Expansion, The Following Should Be Designed: A) Widening The Road To A Width Of 6.0 M, And It Must Be Adapted To Transfer A Load Of 115 Kn To The Axle. The Existing Road Structure Should Be Reconnoitred. B) A Pedestrian Road (Sidewalk) On The Left Side In Accordance With The Road Mileage, C) The Shoulder Improved With 1.0 M Wide Crushed Aggregate On The Side Where There Is No Pedestrian Road, D) Drainage Of The Road Lane, E) Entrances To The Property - The Structures Should Be Agreed With The Ordering Party At The Design Stage, F) If Necessary, Removal Of Conflicts With Existing Utility Networks, G) The Documentation Does Not Include It Is Planned To Develop A Project For The Construction Of A Technological Channel. The Contractor Of The Documentation Is Obliged To Obtain, On Behalf Of The Investor, An Exemption From The Obligation To Build A Technological Duct (In Accordance With Article 39, Section 6C).2. The Scope Of The Subject Of The Order Includes: 1) Development And Submission To The Ordering Party, Within 14 Days From The Date Of Signing The Contract, Of A Design Work Schedule Specifying The Deadlines For The Preparation Of Individual Parts Of The Design Documentation, Administrative Decisions And Opinions, As Well As Arrangements Required By Law, Within The Deadline Specified In The Contract; 2) Development Of A Land Development Concept. As Part Of The Concept, It Is Necessary To:• Describe The Existing Conditi
|