Please Refer To Rfp Section 1 - Introduction, Article 1.2 For Project Description.Please Refer To Schedule 6 - Specifications, Section 01 11 00 - Summary Of Work.Work Of This Contract Comprises The Following:(A)Upgrade Of Existing Building Management Controls System. The New Digital Infrastructure Will Be Integrated Into A Unified Emcs, Providing Centralized And Streamlined Control Of Building Operations. In Addition, The New Emcs Will Have The Ability For Remote Access Using A Common Web Browser.(B)Conversion Of Existing Hybrid-Pneumatic (P-E) Emcs System To A Digital Emcs.(C)Installation Of Associated Mechanical Equipment Including But Not Limited To Valves, New Control Wires, Actuators, Sensors, Thermostats And Dampers.(D)Replacement Of All Existing Control Panels Including Software And Graphics. (E)Supply & Installation Of New Central Control Stations To Suit Emcs Network Infrastructure.(F)A New Centralized Control Station (Ccs) Shall Be Provided At The Location Identified By The Building Facility Group. (G)The Controls Contractor Shall Replace Main Control Panels With Modern Controllers And I/O Expansion Modules To Modern Bac-Net Protocol Controllers And Expansion Modules With New Units As Described In The Design Documents.(H)The Controls Contractor Shall Replace Existing Sub-Net Controllers With New Units As Described In The Design Documents.
Contact Information
Contact Person
Mischa Maree
Address
Suite 2100, 6950-113 StreetEdmonton, AlbertaT6H 5V7Canada
Email
mischa.maree@gov.ab.ca
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107930462
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.