|
Landscaping Work For Green Areas – Elementary School 43 - Open Space Design. New Building Elementary School 43, Straße Der Jugend 3, 99098 Erfurt-Vieselbach - Open Space Design - 1 Piece Of Crown Care For Large Trees H Up To 15M, B Up To 10M Including Tree Protection, Board Casing And Watering During Construction - 5 Pieces Of Shafts Secured And Adjusted In Height - 20 M Protection Of Existing Lines Including Securing 5 Pieces Of Cable Crossings And 3 Pieces Of Slides - 10 M³ Of Earthworks And Search Shafts By Hand, Partly Under Trees - 4M³ Of Foundations Demolished, Disposed Of, Of Which 2M³ By Hand - 100M³ Of Soil Loosened, Disposed Of - 100 M³ Of Soil Loosened, Reinstalled - 180M² Preparing Vegetation Area, Of Which 50 M² By Hand Under Trees - 160 Running Meters Of Path Bordering Steel Tape - 60 M² Concrete Rectangular Paving - Create 550 M² Of Asphalt Surfaces, In Irregular Sub-Areas, Including Surface Treatment With Reactive Resin Bedding - 40M² Edging Of Playing Areas Made Of Small Natural Stone Paving, Curved Shape, W 0.8-1.2M - 160M² Of Fall Protection Areas, Of Which 40M² Are Wood Chips And 120 M² Of Fall Protection Sand - 85 Running Meters Of Floor Markings Lines, Circles, Numbers - 10M³ Concrete Foundations - 16 Pcs Bicycle Leaning Bars - 9 Pcs Impact Protection Bars Garbage Cans - 2 Pcs Waste Containers - 4 Pcs Bench-Table Combination Basic Construction Steel, Supports Hpl - 1 Pc Awning Side Length 8M, Triangular - 2 Pcs Seating Platforms Basic Construction Steel, Supports Hpl; Triangular Floor Plan, Side Lengths 2 To 14M - 1 Climbing System - 1 Piece Balancing System - 1 Piece Table Tennis Table Round - 12 Lm Wooden Play Wall H Up To 3M, Installed On Site, Including Substructure - 8M Concrete Block Step - 50 M Steel Fence, Made Of Frame And Filler Rods, H 1.7M, In Sections (Approx. 3M), Partly To Fit Into Existing Base Wall - 1 Gate, 2-Wing, W 1.5M - 2 Gates W 1.1M Deliver, Install - 28 Core Drillings In Wall Base Existing T 80 Cm - 2 Decorative Steel Gates, Stored On Site, Rework, Install; H 2M, W 4.6M, Flg. - 65 M³ Excavated Soil For Trenches For Pipes And Lines T Up To 1M, - Make 15 M³ Head Holes, Search Shaft - Make 30 Running Meters Of Rw Sewer In Sections - 4 Pcs Yard Drains B125 And C250 - 120M Drainage Channels Nw 100, C250 - 13 M Facade Gutter A15, W 185Mm, Installation In Sections - 3 Pieces Of Clean Running Grids 2.5*1.2 M - 85 Running Meters Of Cable Protection Pipes Pe Dn 100 - 6M³ Excavation Pit For Lighting Mast - 5 Pieces Of Mast Sleeves For Lighting Masts - 5 Pieces Of High Trunks Stu 12-14 Cm To 18-20 Cm Supply, Plant, Incl. Completion And 2-Year Development Maintenance - 60 M³ Of Tree Substrate Delivered, Installed - 185M² Of Lawn, - 50M Leak Test Sewer - Workshop And Assembly Documents For Fences And Gates - Work Planning Seating Platforms - 2 Pieces Sampling And Analysis Soil/Excavated Material According To Ebv And Laga - 4 Pieces Dynamic And 4 Static Load Plates - 1 Piece Digital New Inventory Measurement - Initial Safety Inspection Of The Entire Outdoor Area
|