|
Construction Work – Ul. Mostowa 1A - Renovation And Reconstruction Of The Building Of A Shelter For Homeless Men, Along With Landscaping And Accompanying Infrastructure As Part Of The Project Entitled Modernization Of Infrastructure Related To The Implementation Of Social Policy Tasks. 1. The Subject Of The Order Is The Renovation And Reconstruction Of The Building Of A Shelter For Homeless Men, Along With Landscaping And Accompanying Infrastructure At Ul. Mostowa 1A In Gdańsk As Part Of The Project Entitled Modernization Of Infrastructure Related To The Implementation Of Social Policy Tasks. 2. The Scope Of Work Includes: A) Demolition Works: - Demolition And Dismantling Of Secondary Elements Of The Buildings Facade In Poor Technical Condition, - Demolition And Dismantling Of Secondary Elements Of The Buildings Facade In Poor Technical Condition, - Dismantling Of The Existing Hardening Of The Area, Drainage Strips, - Removal Of Plasters, - Demolition Of Partition Walls, - Dismantling Of The Staircase And Fragments Of Ceilings, - Liquidation Of The Existing Tank For Waste Along With A Section Of The Sanitary Sewage System, B) Land Development: - Construction Of A Ramp For Disabled People, - Regulation And Strengthening Of Slopes, - Construction Of A Pedestrian And Driving Route, A Maneuvering Area, Parking Spaces, Including A Space For Disabled People And A Utility Square, A Sidewalk Around The Building, - Construction Of An Openwork Fence, - Location Of Garbage Bins, Bicycle Racks And A Garbage Shelter, - Construction Of Linear Drainage And A Tank Retention Basin, - Construction Of External Stairs Of The Building, C) Construction Works: - Excavation Around The Building And Exposure Of Foundation Walls, - Construction Of A New Band Around The Building, - Thermal Insulation Of Foundation Walls, Floors On The Ground And Foundations, - Construction Of Waterproof Insulation Of Vertical And Horizontal External Walls, - Construction Of A New Floor On The Ground Along With All Layers Under The Floor, - Replacement Of The Roofing Felt Covering With New Ones In A Two-Layer System, - Construction Of New Foundations For The Boiler Room, - Bricking The Walls And Rim Of The Boiler Room, Building A Roof Over The Boiler Room, - Renovation Of The Roof With The Replacement Of All Layers Of Thermal And Waterproof Insulation, - Construction Of Reinforced Concrete Ceilings, - Construction Of New Lintels, Wreaths, - Construction Of A Substructure For The Ventilation Unit, - Insulation Of The Facade And Construction Of Non-Flammable Facade Strips, - Filling In The Gaps In The Existing Internal And External Walls And Ceilings, - Reconstruction Of The Sanitary Rooms On The Ground Floor Building, - Adaptation Of Rooms On The Ground Floor Into Bathrooms For Disabled People, - Securing Internal Walls With Moisture-Proof Insulation And Laying Ceramic Tiles In Hygienic And Sanitary Rooms, - Finishing Floors With Flooring, - Replacement Of External And Internal Doors, - Replacement Of Window Frames With The Installation Of Hygro-Controlled Air Vents, - Installation Of Internal And External Window Sills, - Replacement Of Cladding, Gutters And Downpipes, - Installation Of A Damper Smoke Room With A Roof Hatch Function, - Construction Of Partition Walls, - Construction Of Suspended Ceilings, - Execution Of Gypsum Plasters, - Painting Of Walls And Ceilings, - Construction Of A Staircase In The New
|