Construction Work For Water And Sewage Pipelines – České Budějovice – Haklovy Dvory – Sewerage, 2Nd Stage. The Subject Of The Public Contract Is The Construction Of New Storm Sewers, Sewage Sewers And Sewer Connections. Furthermore, It Involves The Re-Routing Of The Water Line And The Related Connection Of The Existing Water Connections. Part Of The Scope Of Work Is Also The Reconstruction Of Roads Consisting Of The Complete Replacement Of The Structural And Asphalt Concrete Layers Of The Road, The Construction Of A One-Sided Sidewalk And Entrances To Existing Buildings, The Dismantling Of The Existing And The Construction Of A New Public Lighting Network. The Sewage System Is Designed As A Separate Sewer For The Purpose Of Draining Wastewater From Individual Properties And A Storm Drain For Draining Rainwater From Roads And Parts Of Properties. This Is A Subsequent Ii. Stage, The First Stage Will Be Completely Completed In The First Half Of 2026. Construction Objects: So 000 Construction Site Preparation Objects So 001 Construction Site Preparation So 100 – Road Construction Objects Incl. Culverts So 101 – Communications: The Reconstruction Solves 3 Branches Of Local Roads In Haklové Dvory. As Part Of The 2Nd Stage, The Reconstruction Of Part Of Branch A And The Construction Of An Adjacent One-Sided Sidewalk Will Be Addressed. So 301 Sewage Sewage So 301.1 Sewage Sewage Gravitational Sewerage: Under This So, Gravity Sewage Sewers Will Be Built. Most Of The Village Is Caught By Gravity Sewers. A Separate Sewage System Diverts Wastewater From The Local Area To The Three Lowest Points, From Where It Will Be Pumped By A Series Of Designed Pumping Stations From Western Čs3 To Northern Čs2 And Then Jointly Discharged To Southern Čs1, From Which It Is Led Eastward Via A Discharge Pipe To The Existing Sewage Network Of The City Of Čb (Zavadilka Location With An Outlet To The Municipal Sewage Treatment Plant). As Part Of The 2Nd Stage, Sewer S-2 With A Length Of 365.52 M Will Be Built. So 301.2 Sewage Sewage Connections So 303 Storm Sewer So 303.1 Gravity Storm Sewer: Within This So, Gravity Storm Sewers Will Be Built. The Rain Sewer Drains Stormwater From Roads And Parts Of Real Estate Into The Recipient In Four Places - Southeast And South To Novohaklovského Pond, North And Northwest To Starohaklovského Pond. Sewer Routes Are Located In Local Roads And The Existing Route Of The Drainage Ditch. As Part Of The 2Nd Stage, A D-2 Sewer With A Length Of Dn 300 = 89.88 M, Dn 400 = 249.28 M Will Be Built. So 303.2 Sewer Rainwater Connections So 304 Water Supply So 304. 1 Repositioning Of Water Supply Lines: Repositioning Of The Water Supply, Whose Current Route Runs Through Private Land. As Part Of The 2Nd Stage, The V-2 Water Supply Line With A Length Of 328.96 M Will Be Relocated. So 304.2 Reconnection Of Water Connections So 400 Electricity And Communication Facilities So 401 Public Lighting: As Part Of The 2Nd Stage, The Existing Construction Of A New Vo In Part Of Branch A Will Be Cancelled. So 800 Land Development Objects So 801 Land Development - Greening Part Of The Subject Of The Work Is Also The Design And Discussion Of Traffic Engineering Measures. Post-Planting Care Is Also Part Of The Fulfillment. Two Separate Contracts Will Be Concluded For The Performance Of The Public Contract.
Contact Information
Contact No.
+420 386803215
Email
tanceroval@c-budejovice.cz
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107922752
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.