Road Bridge Construction Work – Modernization Of The Western Overpass Along Dk-91 Al. Jana Pawła Ii / Al. Włókniarzy In Łódź.. The Subject Of The Order Is The Modernization Of The Western Overpass Along Dk-91 Al. Jana Pawła Ii / Al. Włókniarzy In Łódź. • Milling Of The Bituminous Surface Along The Entire Length Of The Flyover And The Length Of The Retaining Walls, • Dismantling Of Protective Barriers, • Dismantling Of Sidewalk Overhangs, • Dismantling Of Thermally Weldable Felt, • Dismantling Of The Support Beam On The Retaining Walls, • Providing Temporary Support For Spans At Expansion Joints, • Dismantling Of Expansion Joints, • Dismantling Of Elastomeric Bearings, • Dismantling Of Drainage Inlets, • Disassembly Of Peregrines • Breaking Out The Front Of The Spans At The Expansion Joints, • Dismantling The Bearing Blocks, • Breaking Out The Corroded Concrete On The Abutments, • Breaking Down The Corroded Concrete On The Support Caps, • Leveling The Surface Of The Top Of The Spans With Low-Shrinkage Mortar Pcc Class R4, • Waterproofing The Spans With Heat-Welded Felt, • Making A Slip Layer With The Felt. Under The Overhangs, • Installation Of Drainage Inlets, • Installation Of New Insulation Drainage Filters, • Installation Of Granite Curbs, • Construction Of Facades Made Of Polymer Concrete Cornice Boards, • Construction Of Sidewalk Overhangs, • Repair Of The Faces Of Spans At Expansion Joints, • Cleaning Of Exposed Reinforcement And Anti-Corrosion Protection, • Repair Of Pillars, • Repair Of Abutments, • Construction Of New Abutments Bearings, • Installation Of New Elastomeric Bearings, • Installation Of New Modular Expansion Joints, • Construction Of Full And Apparent Expansion Joints On Sidewalk Overhangs, • Construction Of A New Support Beam On The Retaining Walls, • Pressure Injection Of Concrete Cracks On The Retaining Walls, • Repairs Of The Concrete Of Pore Walls In The Area Of Drainage Filters, • Cleaning Of All Concrete Surfaces Using The Abrasive Blasting Method, • Repair Of Defects Concrete With Pcc Class R4 Mortars, • On The Entire Surface Of The Flyover (Abutments, Pillars, Bottom Of The Span, Retaining Walls) A Layer Increasing The Cover Of The Reinforcement Made Of Low-Shrinkage Pcc Mortar, Thickness. Min 5 Mm, • Anti-Corrosion Protection Of Exposed Concrete Surfaces, • Construction Of Downpipes, • Cleaning Of Drainage Filters Of Spiro Pipes, • Construction Of A Protective Layer Of Poured Asphalt Insulation, • Construction Of An Sma Wearing Course, • Construction Of The Road Structure On The Access Roads, • Construction Of Horizontal Markings, • Construction Of Surface Insulation On Sidewalk Overhangs, • Installation Of Protective Barriers, • Protection Of The Existing Technical Infrastructure, • Reproduction Of The Graphics Of The Active Rehabilitation Foundation On The Pillar In Axis 8. A Detailed Description Of The Subject Of The Order Can Be Found In Annex No. 1 To The Swz (Description Of The Subject Of The Contract), Design Documentation, And In The Contract Template (Appendix No. 11 To The Swz).
|