Quotation are invited for Investigation and Rectification Work of Oil Leakages in the Transformer Arresting of Oil Leakages in 1032600021 1 ITEM-00001 SCOPE OF THE WORK IN UNIT POWER TRANSFORMER (11/0.4KV, 1250 KVA, ONAN#VOLTAMP# MAKE) OF GT#72:A.#INVESTIGATION AND RECTIFICATION WORK OF OIL LEAKAGES IN THE TRANSFORMER. MINOR LEAKAGE AREAS IN THE TRANSFORMER ARE FROM LV/MV TERMINAL BUSHINGS(2 NOS.), DRAINE VALVE, VENT PLUGS ETC.B.#THE JOBS SHALL BE CARRIED OUT IN THE TRANSFORMER DURING THE UNITANNUAL OUTAGE BETWEEN 03.04.2026 # 10.04.2026. THE TENTATIVE OUTAGE PLANIS SUBJECT TO CHANGES AS PER DEWA POWER SYSTEM REQUIREMENT.C.#ALL REQUIRED GASKETS, O-RINGS, FASTENERS AND CON SUMABLES RELATED TOTHE WORK SHALL BE ARRANGED BY THE CONTRACTOR. (MATERIAL OF GASKETS &O-RINGS: NITRILE RUBBER / NEBAR)D.#TRANSFORME R FULL TANK OIL SHALL BE FILTERED FOR 3 CYCLES. OILCAPACITY OF EACH TRANSFORMER IS 1 EA APPROX. 1050 LITERS. OIL FILTRATION UNIT& OIL STO RAGE TANK SHALL BE ARRANGED BY THE CONTRACTOR FOR THE JOB.E. OIL TESTS (DGA, MOISTURE/WATER CONTENT, CHEMICAL, ACIDITY & BDV)SHALL B E CARRIED OUT AFTER COMPLETION OF THE WORK.F. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR ANY DAMAGE OF THETRANSFORMER ISOLATORS /BUSHING OR ANY DEWA EQUIPMENT DUE TO MISHANDLINGDURING THE JOB AND SHALL ARRANGE TO REPLACE THE DAMAGED PARTS /EQUIPMENT IMMEDIATEL Y AT THEIR OWN COST.G.#ANY JOB WHICH IS NOT INCLUDED IN THE SCOPE, BUT ACTUALLY REQUIRED TOCOMPLETE THE JOB SATISFACTORILY MAINTAINI NG THE QUALITY, SHALL BECONSIDERED WITHIN THE CONTRACTOR#S SCOPE.H.#HIGHLY SKILLED MANPOWER HAVING KNOWLEDGE OF RISKS ASSOCIATED WIT HPOWER TRANSFORMER AND OIL REGENERATION DEVISE SHALL BE DEPLOYED FOR THEJOB.I.#ALL NECESSARY TOOLS/EQUIPMENT REQUIRED FOR JOB EXECUT ION SHALL BEUNDER THE SCOPE OF CONTRACTOR. ONLY TESTED/CERTIFIED TOOLS SHALL BE USEDFOR JOB EXECUTION.J.#COMPLETE REPORT TO BE SUBMI TTED AFTER THE WORK COMPLETION.K. THE CONTRACTOR SHALL CARRY OUT RISK ASSESSMENT FOR ALL HIS WORK ANDSUBMIT RISK ASSESSMENT BEFORE S TARTING THE WORK.L. ALL THE WORKMAN SHOULD WEAR NECESSARY PPES LIKE SAFETY HELMET, SAFETYSHOES, GLOVES, SAFETY BELT ETC. WHILE AT WO RK.WARRANTY: ALL THE WORK CARRIED OUT SHALL HAVE A WARRANTY FOR 1 YEAR FORMATERIALS AND WORKMANSHIP FROM THE DATE OF JOB. ARRESTING OF OIL LEAKAGES IN GT-72BFT02 TRANSFORMER, STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600152)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107911681
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.