|
1. The Subject Of The Order Is The Renovation Of Walls And Ceilings As Well As Floors In Classrooms And Walls In Corridors At Primary School No. 21 In Jaworzno, Ul. Zwycięstwa 30. The Scope Of The Renovation Includes: - Walls, Ceilings - Classrooms No. 12, 18, 24, 25, Teachers Room, Library, Sanitary Facility On The First Floor, Corridors, - Floors - Rooms No. 18, 22, 24, 25, Principals Office, Teachers Room, - Electricity - Sanitary Facility On The First Floor, Teachers Room, Room 18, - Replacement Of Doors - Classroom No. 18 And 12, - Tiles - Room No. 12, - Masonry Works - Room No. 12, 18. The Subject Of The Contract Includes: Painting Walls And Ceilings: Scraping And Washing Old Paint From Walls And Ceilings, Wiping On Walls And Ceilings, Priming Surfaces, Painting Twice With Emulsion Paints, Painting Twice With Oil Paints, Scraping Off Peeling Paint, Reflecting Plasters, Removing Unevenness On The Walls, Making Renovation Plasters, Replenishing The Plaster After Dismantling The Fenders, Installing Fenders, Dismantling And Installing Boards, Forging Out Ventilation Grilles And Installing New Grilles, Protecting Windows And Floors With Foil. Floors: Dismantling The Floor From Fiberboards And Joists, Tearing Off Wall Strips, Tearing Off The Pvc Floor And Carpet Floor, Replacing Osb Boards And Joists, Leveling Subfloors, Priming Subfloors, Making Leveling Layers For Carpets, Laying Homogeneous Carpets With Welding, Replacing Door Thresholds, Tearing Up Cement Floors, Cutting The Subfloor, Making Leveling Layers And Strengthening Concrete Surfaces, Priming The Subfloor, Laying A Tile Floor With A Plinth. Masonry: Cutting Out A Space In The Floor For The Partition Wall, Making A Wall From Aerated Concrete Blocks, Cutting Out Cracks In The Wall, Filling And Plastering, Removing And Disposing Of Rubble. Door Joinery: Dismantling Door Leaves, Carving Door Frames Out Of The Wall, Removing Unevenness, Installing Door Frames And Sealing Door Frames, Installing Door Leaves, Sealing Door Frames, Painting Twice Oil Paint On Door Joinery, Removal And Disposal Of Debris. Installation Works - Electrical: Disconnection Of Wires With A Cross-Section Of Up To 2.5 Mm2, Disassembly Of Lighting Fixtures, Preparation Of The Ground For Installation Equipment, Making And Grouting Of Grooves, Laying Cable Wires, Checking The Insulation Condition With An Inductor, Measuring The Illumination Intensity. In Accordance With: 1. Technical Specification For The Execution And Acceptance Of Construction Works Regarding Renovation Of Walls And Ceilings And Floors In Classrooms And Walls In Corridors In The Primary School No. 21 In Jaworzno, Ul. Zwycięstwa 30 Constituting Annex No. 1 To Swz, 2. Bill Of Quantities For Renovation Of Walls And Ceilings And Floors In Classrooms And Walls In Corridors In The Primary School No. 21 In Jaworznie, Ul. Zwycięstwa 30” Constituting Annex No. 2 To Swz,3. Description Of The Subject Of The Order Constituting Annex No. 3 To The Swz
|