The Subject Of The Order Is The Renovation Of A Section Of Vertical And Horizontal Insulation Of The External Wall Of Rooms In The School And Kindergarten Complex No. 2 In Jaworzno At Ul. Chropaczówka 101. Performing Works In The Scope Of: Painting Walls And Ceilings: Preparing Surfaces For Painting By Scraping And Washing Old Paint, Dismantling And Reassembling Radiator Covers, Wiping Existing Internal Plasters, Repairing Cracks And Damage, Filling Cracks, Filling Uneven Surfaces, Priming Substrates - Vertical And Horizontal Surfaces, Double Painting Surfaces Plastered With Emulsion Paints, Painting Twice Using Oil Paint On The Paneling With One Coat Of Filler, Carving Out And Installing Ventilation Grilles From The Wall, Flooring Works: Tearing Up The Pvc Floor, Dismantling The Cement Floor, Tearing Off The Cement Plinth, Making Strips Of Plain Plaster After Tearing Off The Plinth, Leveling Horizontal Surfaces - Local Leveling Of Defects, Making Moisture-Proof And Water-Proof Insulation, Making A Leveling Layer For Mortar Floors Cement Thickness 20 Mm Sharply Troweled, Leveling Layers Made Of Polymer-Cement Mass For Plastic Floor Coverings, Priming The Substrate, Laying A Floor Made Of Artificial Carpets, Welding Rolled Floor Coverings, Replacing Door Strips. Door Joinery: Forging Steel Door Frames From The Wall, Installing And Sealing Door Frame Joints, Installing And Fitting Door Leaves, Making Ordinary Internal Plasters On The Reveals. Wall Insulation + Band: Construction Of A Fence Around The Work Zone For The Duration Of The Works, Dismantling Of The Paving Stone Surface, Manual Dismantling Of The Stone Aggregate Foundation, Dismantling Of The Concrete Trough, Dismantling Of Reinforced Concrete Elements, Dismantling Of The Sidewalk (Upper Platform And Slope Covered With Paving Slabs), Manual Dismantling Of The Stabilized Soil Base, Performing Narrow-Space Excavations, Preparing The Ground For Thermal Insulation, Mechanical Cleaning And Washing, Priming, Making A Bonding Layer And Coat, Making Single-Layer Renovation Plasters, Making Moisture-Proof Insulation, Making Vertical Insulation, Making Grooves, Checking The Adhesion Of The Adhesive Mortar To The Substrate, Preparation For Insulation Using The Light Wet Method - Priming With A Strengthening Preparation - Once, Insulating Basement Walls With Full-Surface Polystyrene, Insulating Vertical Walls With Dimpled Foil, Execution Sheet Metal Workings, Backfilling Of Excavations, Topsoiling Of Slopes And Sowing With Grass, Sealing Of Expansion Joints, Manual Construction Of The Trough To A Depth Of 20 Cm, Construction Of A Sub-Base Made Of Natural Aggregate, Thickening The Drainage Layer In The Trough, Sand Treatment With Pouring Water Over The Sub-Base Made Of Concrete Mixture And Cement-Stabilized Soil, Construction Of A Sidewalk Made Of Concrete Slabs On A Cement-Sand Ballast With Filling The Joints With Sand, Making A Sidewalk Made Of Paving Stones On A Cement-Sand Ballast With Filling The
|