4.1. The Subject Of The Order Is Construction Work On The Investment Task Titled: Construction Of An Observation Deck On The Island With An Arch Footbridge In The Valley Of Ten Ponds In Poniatowa, Implemented As Part Of The Project Development Of Tourist Infrastructure Of The Valley Of Ten Ponds In Poniatowa.4.2. The Subject Of The Order Is The Execution Of Construction Works, Which Mainly Include: • Construction Of An Arch Footbridge Made Of Solid Composite Boards With A Thickness Of 20 Mm, Mounted On System Joists And Aluminum Profiles, Based On Steel Beams, Placed On Foundation Piles, • Weeding Of The Island Area, • Cutting Down 3 Trees, • Dismantling The Existing Lighting Pole, • Construction Of A Hardened Access To The Arch Footbridge, With Washed, Bevelless Paving Stones, • Construction Of A Viewing Terrace Located On The Island, Made Of 20 Mm Thick Solid Composite Boards, Mounted On System Joists And Aluminum Profiles, Based On Steel Beams, Placed On Foundation Piles. • Installation Of A Steel Balustrade On The Arched Footbridge And Around The Viewing Terrace, • Installation Of A Garland On The Balustrade Of The Footbridge And On The Viewing Terrace, • Installation Of Small Architecture Elements On The Terrace Viewing Area, Including: 5 Pieces Of Single Park Benches, 2 Pieces Of Waste Bins, • Strengthening Of The Island Shore Using The Fascination Method With A Length Of 80 M, • Installation Of A Lighting Lantern With A Power Supply And Lighting Control Cabinet For The Footbridge And Observation Deck, And A Low-Voltage Lighting Cable Line On A 30 M Long Route, By Connecting To The Existing Cable Lighting Line.4.4. Compliance Of The Project With The Principle Of Dnsh And Sustainable Development: 1) At Each Stage Of Implementation, The Contractor Is Obliged To Ensure Compliance With The Document Compliance Of Projects Financed From European Union Funds, Including Those Implemented Under The National Reconstruction And Resilience Plan, With The Principle Of Do No Significant Harm - The Principle Of Dnsh Manual For The Beneficiary, 2) Execution Of The Order In Full Compliance With The Technical Guidelines On The Application Of The Principle Of No Significant Harm. Cause Serious Damage Pursuant To The Regulation Establishing The Recovery And Resilience Facility 2021/C 58/01;3) Execution Of The Order In Full Compliance With The Document Assessment Of The Dnsh Principle And Sustainable Development - Annex No. 1.1 To Swz.4.5. A Detailed Description Of The Subject Of The Order Can Be Found In Annex No. 1 To The Swz. It Consists Of The Following Documents: 1) Construction Design Titled: Construction Of An Observation Deck On The Island With An Arched Footbridge2) Technical Design Titled: Construction Of An Observation Deck On The Island With An Arched Footbridge3) Detailed Technical Specifications For The Execution And Acceptance Of Works (Stwior) Titled: Construction Of An Observation Deck On The Island With An Arched Footbridge4) Bill Of Quantitie
Contact Information
Address
Gmina Poniatowa,Poniatowa,24-320,Lubelskie,Pl815 - Puławski
Contact No.
818204836
Email
urzad@um.poniatowa.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107879314
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.