1. The Subject Of The Order Is The Thermal Modernization Of A Multi-Family Residential Building Constituting The Municipal Housing Stock Of The Wągrowiec Municipality. The Facility Is Located At Ul. Krętej 24 In Wągrowiec. There Are 6 Municipal Apartments In The Building. The Scope Of Work Covered By The Order Should Be Performed On The Basis Of The Notification Of Construction Works, In Accordance With The Attached Technical Documentation. The Implementation Of The Project Will Save Energy, In Particular Thermal Energy. Moreover, Due To The Implementation Of The Project, The Annual Primary Energy Consumption In The Building Will Decrease, Which Will Also Contribute To Reducing Co2 Emissions. The Project Will Significantly Contribute To Improving The Natural Environment And Reducing The Costs Of Maintaining Municipal Buildings In The Wągrowiec Municipality.2. The Order Will Include, Among Others: 1) Thermal Insulation Of The Façade. Insulation 15 Cm And The Ceiling Above The Ground Floor Of The Building (Under The Unheated And Unused Attic) Thickness. 24 Cm Of Insulation, 2) Painting The Facade, 3) Replacement Of External Doors, 4) Renovation Of Staircase And Balustrade Cladding, 5) Replacement Of Downpipes And Flashings, 6) Renovation / Replacement Of The Lightning Protection System, 7) Renovation Of The Strip Around The Building, 8) Disassembly And Reassembly Of Elements And Renovation And Replacement Of Facade Equipment (Installation Cabinet Doors, Signs, Antennas, Roller Blinds, Etc.), 9) Execution Of Works Related To The Dismantling Of The Old Premises Heating System,10) Performance Of Construction Works Necessary To Install Elements Of The Apartment Heating System (Supply Network, Radiators With Valves),11) Delivery And Installation Of Central Heating System Elements,12) Installation Of Heat Dividers On Each Radiator Compatible With The Heat Accounting System Used By The Building Manager, Which Is Used In Other Facilities. The Central Heating Installation Will Be Powered By The Pec Wągrowiec Heating Network. 3. During The Execution Of The Order, The Contractor Is Obliged To Take Into Account Both Social And Environmental Aspects, Apply Technologies That Reduce The Negative Impact On The Environment, The Level Of Pollutant Emissions, Noise, Consumption Of Water, Electricity, Heat And Fuel, And Waste Generation.4. During The Execution Of The Order, The Contractor Is Obliged To Carry Out The Following Activities Taking Into Account Environmental Aspects: 1) Management And Disposal, At The Agreed Cost And Risk, Of Demolition Materials, I.E. All Materials And Equipment Resulting From Demolition Works, Etc., And Waste Materials. These Works Should Be Carried Out In Accordance With The Provisions Of The Waste Act, The Act On Maintaining Cleanliness And Order In Municipalities And Generally Applicable Local Regulations; 2) Carrying Out The Works In A Way That Does Not Cause Devastation Of The Area Around The Constructed Facility; 3) Carrying Out Th
|