|
1. The Subject Of The Order Is The Renovation Of Walls, Ceilings And Doors To Cabins In The Mens Toilet On The First Floor Of The Primary School No. 22 In Jaworzno At Ul. Banasika 1. Painting Walls And Ceilings: Carving Out The Wall And Installing Ventilation Grilles, Securing Floors And Windows, Dismantling A Single- And Double-Plate Steel Radiator - Scraping And Washing Off Old Paint, Preparing The Surface For Painting With Filling Of Unevenness, Erasing Efflorescence, Wiping The Plaster Of Internal Walls And Ceilings, Priming The Substrates - Vertical And Horizontal Surfaces, Preparing The Surface For Painting With Paints Emulsion Paints, Painting Plastered Wall Surfaces And Ceiling Surfaces With Emulsion Paints. Painting The Surfaces Of Walls And Window Sills With Oil Paints, Removing And Disposing Of Rubble. Tile Floor, Preparation Of A Workstation, Tearing Off The Tile Floor Covering, Demolition Of The Cement Floor, Milling Of Concrete Surfaces And Preparation Of The Surface By Vacuuming The Substrate, Making Moisture-Proof And Water-Proof Insulation From Polyethylene Foil, Making A Reinforced Cement Floor With Plinths, Making A Leveling Layer For Mortar Floors Cement Thickness 20Mm Sharply Troweled, Priming, Laying Stoneware Tiles Measuring 60X60cm On Adhesive Mortar With A Thickness Of 5Mm. Door Joinery - Carving Steel Door Frames Out Of The Wall, Removing Unevenness On The Wall Surface To Level And Adapt To The Required Width Of The Door Opening With Polyurethane Foam Sealing, Making A Lintel, Completing Internal Plasters At The Openings Of The Replaced Doors, Making Ordinary Internal Plasters, Installing Steel Door Frames And Internal Door Leaves And Their Adjustment, Adjusting Door Leaves, Filling And Smoothing Out Unevenness, Repainting With Emulsion Paint And Paneling Oil Paint In The Color Of The Walls, Installation Of Threshold Strips At The Doors, Removal And Disposal Of Rubble. Construction Works - Dismantling Of Wall Cladding And Stripping Of Internal Plasters Made Of Cement-Lime Mortar On The Walls, Demolition Of Brick Walls, Walls Made Of Bricks With Lime And Cement Mortar, Replenishment Of Internal Plasters At The Openings Of The Replaced Doors, Execution Of Ordinary Internal Plasters, Facing The Walls With Ceramic Tiles Mounted With Glue, Construction Of A Separating Wall Next To The Washbasins, Removal And Disposal Of Rubble. Disassembly Works: Disassembly Of A Porcelain Washbasin, A Toilet With A Porcelain Bowl, A Porcelain Urinal, Drain Outlets Made Of Pvc And Cast Iron Pipes, A Cast Iron Sewage Pipeline With A Diameter Of 50-100 Mm - On The Walls Of The Building, Vertical Diameter 110 Mm, Cast Iron Drain With A Diameter Of 100 Mm, Cleaning Of The Horizontal Cast Iron Sewage Pipeline. Installation Works - Electrical Disconnection Of Cables, Disassembly Of Lighting Fixtures, Replacement Of Switches, Replacement Of Cables, Digging Grooves, Filling Of Grooves, Replacement Of Flush-Mounted Boxes, Splash-Proof Installation Con
|