Ventilation Installation Work – School An Der Ruhr, Mintarder Weg 43, Heating And Cooling. The Subject Of The Measure Is The Construction Of The Heating And Cooling Systems. Heat Is Generated Via An Air-Water Heat Pump With Natural Refrigerant (R290) And Buffer Storage. The Installation And Enclosure Are Carried Out In Compliance With The Noise, Safety And Explosion Protection Requirements. Heat Is Distributed Via A Low-Temperature Heating System With Underfloor Heating, Static Heating Surfaces And Heating Registers In The Ventilation Systems. The Systems Are Equipped With Highly Efficient Pumps, Hydraulic Balancing And Control Components. In Addition, A Split Refrigeration System Will Be Installed To Dissipate Internal Heat Loads From The It System. All Services Are Carried Out In Accordance With The Applicable Technical Rules, Fire Protection Requirements And Legal Requirements, Including Testing And Commissioning. Main Quantities Of Copper Pipe 1,185 M Pumps / Heating Circuits 9 Pieces Firewall 32 Pieces Heating Surface Fbh 3,400 M2
Contact Information
Address
Lindenallee 68
Contact No.
+49 20188-60132
Email
vergabe@immo.essen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 107864225
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.