|
Technical Building-Inspection Services – Fn Plzeň - Implementation Of Electrical Inspection Activities (2026 - 2027). The Subject Of The Public Contract Fn Plzeň - Implementation Of Electrical Revision Activities (2026 - 2027) Is: Revision Of Electrical Appliances, Electrical Installation And Measurement Of Electrostatically Conductive Floors In The Premises Of Fn Plzeň - Fn Lochotín. Fn Bory And Fn Bory Bvn (Former Military Hospital), Supplementing (Updating) Mandatory Documentation In Off-Campus Facilities. 2.1. Contract Specifications 1) Revision Of The Electrical Installation Revisions Will Be Carried Out In The Buildings Of Fn Plzeň, In The Premises Of Fn Lochotín, Fn Bory And Fn Bory Bvn And Off-Campus Objects In The Territory Of The City Of Pilsen (Total Approximate Number Of Rooms - 13,700; Estimated Number Of Outlets (Fuses, Disconnectors, Circuit Breakers, Protectors, Starters, Sez,...) - 50,000 Pcs.; Number Substation - 130). The Client Requires A Revision Of The Electrical Installation According To Čsn 33 2000 – 6 Ed. 2, Čsn 33 1500. The Basis For Processing The Offer Is The Detailed Specification Of The Clients Requirements, Set Out In Article 2, Annex No. 7 Of This Procurement Documentation. 2) Revision Of Electrical Appliances Revisions Will Be Carried Out In The Buildings Of Fn Plzeň, On The Grounds Of Fn Lochotín, Fn Bory And Fn Bory Bvn And Off-Campus Objects (Estimated Number Of Electrical Appliances – 19,000 Units/Year). The Client Requests The Revision Of Electrical Appliances According To Čsn 33 1600 Ed. 2. The Basis For Processing The Offer Is The Detailed Specification Of The Clients Requirements, Listed In Article 3, Annex No. 7 Of This Procurement Documentation. 3) Measurements Of Electrostatically Conductive Floors The Measurements Will Be Carried Out In The Buildings Of The Plzeň University Of Applied Sciences, In The Premises Of The Lochotín University Of Applied Sciences, The Bory University Of Applied Sciences And The Bory University Of Applied Sciences Bvn (Estimated Number Of Measured Rooms – 600 Units/Year). The Client Requests The Measurement Of Electrostatically Conductive Floors According To Čsn 33 1500, Čsn En 61340-5-1 Ed.3. The Basis For Processing The Offer Is The Detailed Specification Of The Contracting Authoritys Requirements, Set Out In Article 4, Annex No. 7 Of This Procurement Documentation. 4) Update Of Electrical Documentation And Additional Labeling In The Field The Client Requests As Part Of The Revision Of Electrical Installations: - Development Of Missing And, If Necessary, Updating Of Existing Protocols On The Determination Of External Influences And Protocols On The Use Of Rooms For Medical Purposes For Revised Rooms (In Cooperation With The Client) See Article 5, Appendix No. 7 - Missing Additional Labeling Of Switchboards And Other Electrical Installation Equipment, See Article 5, Appendix No. 7 ▪ Drawing Changes, I.E. The Current State Of Electrical Installation Positions In The Submitted Plans, ▪ Drawing Changes, I.E. The Current State Of Switchboards And Possible Corrections Of Power Supply Schemes Of Objects In Pencil And, Upon Request, Subsequent Drawing By A Certified Electrical Designer In The Submitted Plans In Dwg Format. Plans Must Be Submitted In Dwg And Pdf Format, Scope And Deadlines See Article 6, Attachments No. 7.
|